Page 381 - Decision Making Applications in Modern Power Systems
P. 381

Maintenance management with application Chapter | 13  343



               TABLE 13.1 (Continued)
               Pillar of specific improvements          Evaluation/progress/
                                                        criteria
               Evaluation/progress/  Background/objective  Expected condition
               criteria
               5. Standardize operational  After achieving the  Interim operational
               procedures, ensuring that  expected results,  standard completed and
               engines and auxiliary  standardize the procedures  being used by the
               equipment are operated  that should be followed by  operators in each engine
               within the required  all operators       and auxiliary equipment
               conditions of pressure,
               temperature, speed,
               rpm, etc.
               6. Analyze the existing  Improving the quality of  Performance of the
               operational reports and  information to assist in the  operation/motor and
               make the necessary  investigation of losses and  auxiliary equipment being
               modifications to improve  their eliminations  evaluated by comparing
               the quality of the                       the indicators and
               annotated information,                   objectives defined for each
               including maintenance                    engine/plant. Information
               stops by motor or auxiliary              of the operational reports
               equipment, lack of spare                 being provided with
               parts, labor problems,                   quality and accompanied
               transportation, etc.                     by the managers,
                                                        supervisors, and operators.
                                                        No data distortion






                Members of the audit pillar checklist should meet monthly to discuss the
             MTBF goals and the monthly MTTR and other activities corresponding to
             the Maintenance Management Program (Table 13.5).


             13.4 Predictive maintenance using computational (fuzzy
             logic) decision support tool in preload dispatch

             An application of fuzzy logic is justified by the ability to anticipate the pos-
             sibilities of making the predispatch time of the load on the operational tasks
             of the equipment.
                This study deals with the application of fuzzy logic to load dispatch, but
             with a particularity that is to perform said predispatch of load taking into
             account the technical state of the engines, evaluated by different variables
             related to maintenance. In the first part the development of the fuzzy rules
             and of the whole procedure of inference is exposed, and in the second part,
             all the tests to evaluate the maintenance and the technical state of the motors.
   376   377   378   379   380   381   382   383   384   385   386