348  Decision Making Applications in Modern Power Systems



              TABLE 13.4 (Continued)
              Pillar of maintenance education and training  Evaluation/progress

              Evaluation/progress/criteria  Background/   Expected condition
                                       objective
              6. Elaborate internal/external  Level the knowledge  Planning to carry out
              training plan, one-point  of the working group  the training identified
              training, APSM, and lectures to  participants so they  in the previous item,
              adapt the knowledge need of  can take on other  including lectures,
              each work group participant  activities without any  one-point training,
                                       problem, according to  APSM, etc.
                                       the steps of the ME,
                                       autonomous
                                       maintenance (AM),
                                       planned maintenance
                                       (PM), and audit
                                       maintenance system
                                       (AMS) pillars








              TABLE 13.5 Checklist pillar auditoria.
              Activities name       Responsibility  Check list
              Check cleaning of areas  Plant manager  Check leaks, state of conservation,
                                                 paint, and signage
              Check the binder where  Supervisors  Check if the cleaning pattern plug
              the “cleaning pattern” of          is placed in an easy to read
              the area is located                location
              Check if the tags are in  Plant manager  Check in the label control software
              control                            if there is any movement of
                                                 placement of new labels
              Check action plan to  Plant manager  Check in the label control software
              remove labels         and supervisors  if there is an action plan for
                                                 removing the labels
              Check signage of plants  Plant manager  Check standardization of signaling
                                    and supervisors
              Check Maintenance     Engineering  Check if the information is up to
              Management Program                 date
              (MMP) frame of the plant