Multistage and decentralized operations of Chapter | 16  431




























             FIGURE 16.11 Impact of flexibility.


























             FIGURE 16.12 Impact of regulation threshold.


             operations, it will be beneficial for an EV fleet manager to maximize each
             EV’s connected duration flexibility, by either having them arrive earlier or
             leave later.
                In the market participation simulations presented earlier, the minimum
             threshold to participate was 10 kW, which was appropriate the size of the