Page 472 - Decision Making Applications in Modern Power Systems
P. 472
Multistage and decentralized operations of Chapter | 16 431
FIGURE 16.11 Impact of flexibility.
FIGURE 16.12 Impact of regulation threshold.
operations, it will be beneficial for an EV fleet manager to maximize each
EV’s connected duration flexibility, by either having them arrive earlier or
leave later.
In the market participation simulations presented earlier, the minimum
threshold to participate was 10 kW, which was appropriate the size of the