            16.4.5 Impact of the flexibility and market participation threshold
            The impacts of different factors on the revenue-generating capability of the
            EV fleet, including the freedom of baseline power profile selection, flexibil-
            ity of individual EV, and market participation threshold, will be discussed
            here. Simulation results indicate that proper tuning of these factors can lead
            to significant improvements in revenue generation.


            16.4.5.1 Impact of baseline calculation
            As opposed to the regulation simulation described above where baseline charg-
            ing power was a decision variable, here, instead, the charging profiles obtained
            by solving Problem 2 were used as baselines. As shown in Fig. 16.10, the actual
            power (red) generally follows the baseline power profile (blue), unlike that
            shown in Fig. 16.6. However, the capability of the smart charging program was
            limited in exploring more space to generate revenues from regulation markets.
            The monthly revenue from regulation in June, 2016, was reduced from $95 to
            $36. Thus with a preset baseline power profile, the flexibility was limited as
            well as the revenue-generating capability.
               The impact of individual vehicle charging flexibility on regulation market
            revenues is examined here. The total connected duration of each EV was
            increased by multiple ratios to simulate different degrees of EV connected
            time flexibilities. For the months shown in Fig. 16.11, January, June, and
            August 2016, the revenues increased rapidly as the ratio of connected time
            to charging time increased from 1 to 2.5. However, as the ratio increased
            beyond 2.5, the total monthly revenue gradually plateaus. Note that in the
            simulation, the maximum connected duration for each EV was 2 days. Thus
            within the given time period, there exist limitations of revenue improvement
            by extending EV connected duration flexibility. However, for real-world