Page 339 - Defrosting for Air Source Heat Pump
P. 339

334                                         Defrosting for Air Source Heat Pump


                   100,000
                                        First cost  Running cost
                    90,000
                    80,000  75,291.63  75,007.65
                                                  71,807.29   71,774.88
                    70,000
                 )
                 Y
                 N  60,000
                 C
                 (
                 t
                 s  50,000
                 o
                 c          67,291.63  66,992.65  63,657.29   63,609.88
                 l
                 a  40,000
                 t          89.37%      89.31%     88.65%     88.62%
                 o
                 T
                    30,000
                    20,000
                    10,000
                       0
                            Case D5    Case D6     Case D7    Case D8
                                          Four typical cases
         Fig. 10.24 Total costs in the four typical cases over 15 operating years.

                   80,000
                                   Case D5
                   70,000
                                   Case D6
                                   Case D7
                   60,000
                                   Case D8
                  )
                  Y  50,000
                  N
                  C
                  (
                  t  40,000
                  s                             76,000
                  o                                  Case D5
                  c                             74,000  Case D6
                  l                                  Case D7
                  a                                  Case D8
                  t  30,000                     72,000
                  o                             )
                  T                             Y  N  70,000
                                                C
                                                (
                                                t
                                                s
                                                o
                                                c  68,000
                   20,000                       l  a  t  o
                                                T
                                                66,000
                                                64,000
                   10,000                       62,000  D5 > D6 > D7 ≈ D8
                                                     13    14    15
                                                        Operation time (year)
                      0
                           0    2    4     6    8    10   12   14    16
                                        Operation time (year)
         Fig. 10.25 Total costs in the four typical cases in the 15 operating years.
         valves were installed. In addition, for the running cost in the heating season without
         frost formation, from Case D5 to Case D8, the values were 14,936.17 CNY, 14,936.17
         CNY, 13,794.8 CNY, and 13,794.8 CNY, respectively. The effects of the water-
         collecting trays on defrosting performance did not exist in this operating season.
         But the effect of the valves was shown, with the difference of 1141.37 CNY between
   334   335   336   337   338   339   340   341   342   343   344