P. 408

Production 90/60/30 day  State street  forecasts  control  assembly  Daily  MRP  order  18,400 pcs/mo  −12,400 “L” Weekly schedule  −6,400 “R”  Tray = 20 pieces  2 shifts  Daily ship  schedule  1x  daily  Shipping Assembly #2 Assembly #1 S. weld #2  Staging  2700 L  1200 L  1600 L  144



         6-week  forecast                   1100 L  600 R   1.8 days  A Complete Value Stream Map for a Manufacturing Process

                                         S. weld #1  C/T = 38 seconds  C/O = 10 minutes  Uptime = 100%  27,000 sec. avail.  38 seconds
             Weekly  fax                                       2 shifts


            Michigan  Steel Co.  500-ft coils  4600 L  2400 R  7.6 days
                      Tues. +  Thurs.
                                         Stamping  200 T  C/T = 1 second  C/O = 1 hour  Uptime = 85%  27,000 sec. avail.  EPE = 2 weeks   1 second




                                           Coils  5 days    5 days   Figure 10.18