Page 389 - Enhanced Oil Recovery in Shale and Tight Reservoirs
P. 389

Fracturing fluid flow back
                                                                  production (Fakcharoenphol  days  30  and  15,  7,  day,  0  of  times  shut-in  the  at  (B)  361

                                                                  gas
                                                                  cumulative




                                                                  and
                                                                  (A)
                                                                  rate

                                                                  production



                                                                  Gas
                                                                  12.17  2016).

                                                                  Figure  al.,  et
   384   385   386   387   388   389   390   391   392   393   394