Page 120 - Estimators Piping Man Hour Manual
P. 120

Section Two-FIELD  FABRICATION    103

                       ECCENTBIC SWEDQED            ENDS


                                  Labor For Welding
                                 Carbon Steel Material

                                NET MAN HOURS EACH
           Standard  Extra
             Pipe  Heavy Pipe               3CHEDULENU1HBERS
     Size  &OD Sizes it  OD Sizes
     Ins.  3/8"  Thick 1/2"  Thick  20  30  40  60  80   100   120   140  160
                                              __          __         __
     2       1.8      2.2          _.    1.8        2.2                   3.9
     2-1/2   2.0      2.9    —           2.0        2.9        —          4.6
                             —     —          —                —     —
                             __                           — __  __
     3       2.3       3.2               2.3        3.2   __              5.2
     3-1/2   2.6       3.8         —     2.6  —     3.8              — --
                             —     —          —                —          —
     4        3.1      4.5               3.1  --    4.5   ..   7.1   ..   7.6
                             —     —
     5       4.0       6.0               4.0  ..    6.0        9.4        10.4
                             —     —                      —          —
     6       4.9       7.1         —     4.9        7.1       12.8        14.4
                             —                —           —          —
     8        7.3     11.9   7.3   7.3   7.3  --   11.9  20.5  20.1  22.1  24.1
     10      10.0     16.2   10.0  10.0  10.0  16.2  20.1  24.8  32.1     45.8
                                                                     —
     12      13.7     21.1   13.7  13.7  21.1  25.6  32.9  43.9  56.8     64.0
                                                                     —
     MOD     19.4     30.2   19.4  19.4  31.0  37.5  45.8  58.6  80.5  --  ..
                                                                           __
     16  OD  27.4     40.2   27.4  27.4  40.2  47.6  52.3  68.8  89.7  --
     18 OD   32.5     54.9   32.5  32.5  60.4  85.2       „    „_    ..    ..
                                                    —
     20 OD   36.0     62.9   36.0  36.0  68.8 100.7
                                                    —     —    —     —     —
                                  R1
       f\W\
             91. J
     M \JLJ  Ri  ^    n<9  A  R1  9  31. a 1
                      o*. t
                             01. O
     Pipe  Thickness: The  wall  thickness  of  the pipe determines the  man hours that  will apply.  For
        swedged ends on double extra  strong  pipe thickness, use  schedule  160 man  hours.
     Ends:  All man hours are  based  on ends being furnished either  plain or  beveled  for welding.
     Unlisted  Sixes:  Unlisted sizes take the next higher listing.