Be st Practice 8 .11          Pump Mechanical Seal Flush Best Practices
       chamber pressures and temperatures to change and lead to  seal chamber temperature. Flush plans with coolers (21, 23, 41
       premature seal wear and/or failure. Note that the stated EROE  etc.) have an option for a thermometer downstream of the
       low flow range can be reduced if the pump or fluid have any of  cooler which can be used to determine the seal chamber tem-
       the characteristics noted in Figure 8.11.7.          perature. This value must be compared to the PT (pumping
                                                            temperature) value listed on the data sheet. If the measured
                                                            value does not agree with the data sheet, consult with operations
                                                            first to see if process changes can be made. If they cannot be
           Pumps with suction specific speeds > 8,000 (customary units)  made, discuss the measured temperature with the seal vendor
           Double suction pumps
                                                            representative. Alternative options for measuring seal fluid
           Water pumps with low NPSH margin
           Fluids with S.G.< 0.7                            temperature are noted in Figure 8.11.10.

       Fig 8.11.7   Factors that can reduce low flow EROE range
                                                                Temperature gun close to seal gland – be sure to monitor off of
          Therefore, we always recommend that the first step in seal  a non-reflective surface       °
       condition monitoring is determination of pump operation within  Surface contact thermometer on flush line – add 5 C to
                                                                measured value if pipe and use recorded value if SS tubing
       its EROE. If the ‘bad actor’ pump is operating outside its EROE,
                                                                Install a thermometer in the flush line
       we recommend the action shown in Figure 8.11.8.          Use an infrared camera to record temperature and temperature
                                                                profile

                                                            Fig 8.11.10   Alternative methods to measure seal fluid temperature
           Consult operations to determine if process changes can be
           made to operate in EROE
           De fi ne target EROE parameters for operations (flow, amps,
           control valve position, delta T)                 Pressure monitoring

                                                            Unless the plant assigned machinery specialist is ‘world class’
       Fig 8.11.8   If a centrifugal pump is outside its EROE:
                                                            there are usually no pressure gauges in the flush line or seal
                                                            chamber. Our recommendations concerning seal chamber
          If seal reliability does not improve when operating within the  pressure monitoring are presented in Figure 8.11.11. The
       EROE, further investigation is required concerning the process  measured seal chamber pressure must be compared to the seal
       conditions in the seal chamber and/or flush system as noted in  vendor’s assumed value, which should be on the seal layout
       the remaining sections.                              drawing. If this value is not present, the seal vendor should be
                                                            consulted. Note that the seal vendor assumed seal chamber
                                                            pressure is the value that was used in the calculation of the seal
       Confirm process conditions are as stated in           PV. If the measured value does not agree with the data sheet,
       data sheets                                          consult with operations first to see if process changes can be
                                                            made. If process changes cannot be made, discuss this fact with
       If the ‘bad actor’ pump seal reliability, when operating in the  the seal vendor representative.
       EROE, does not significantly improve, a complete check of seal
       fluid conditions in the seal chamber is required. Figure 8.11.9
       shows the process variables that influence seal reliability.
                                                                Install a pressure gauge in the seal chamber
                                                                Modify the seal flush line for installation of a pressure gauge

        1. Seal Chamber Temperature                         Fig 8.11.11   Seal chamber pressure monitoring guidelines for ‘bad
        2. Seal Chamber Pressure                            actor’ seals
        3. Seal Fluid Characteristics:
            Cleanliness
            Vapor Pressure
            Viscosity                                       Seal fluid characteristics
            Specific Heat
            Specific Gravity                                 If all of the above mentioned items are in accordance with the
                                                            seal design (EROE, seal chamber temperature and seal chamber
                                                            pressure), a check of the seal fluid characteristics is required.
       Fig 8.11.9   Seal reliability and pump fluid conditions are based on:
                                                            Figure 8.11.12 presents guidelines for checking the seal fluid
                                                            characteristics.
       Temperature monitoring                                 If the measured fluid sample parameters are not as stated on
                                                            the data sheet, consult with operations first to see if process
       Since seal chamber or seal flush line pressure gauges are not  changes can be made. If process changes cannot be made, dis-
       usually installed on new pumps, the first place to start is with  cuss this fact with the seal vendor representative.