Page 254 - Improving Machinery Reliability
P. 254

Machiriery Reliabilily Audits and Reviews   225

                                                                Dale Ordered ___
                                                    Project Tills ~
                                                    Piojecl No   ItemNo
                                                    Purchase Order NO
                         Locallon      Unil - ____   Inquiry No
                         SSWCS                      Date













































                       Figure 3-99. Centrifugal compressor vendor drawing and data requirements.


                   assigning the parts identifying code letters. This would assure that whenever a coded
                   part  were to  be ordered, both the purchasing  department and warehouse receiving
                   personnel would be notified  of the special inspection requirements needed to assure
                   machine reliability.
                     Machinery reliability  audits should be conducted by  mechanical  engineers with
                   extensive design and plant machinery experience. These audits are generally struc-
                   tured to:
   249   250   251   252   253   254   255   256   257   258   259