Page 423 - Improving Machinery Reliability
P. 423

Maintenance for Continued Reliability   381


                                          Table 10-2 (Continued)
                  Documentation  Lubrication history will be captured electronically and stored in the Computerized
                              Maintenance Management System.
                  Document    Life of equipment
                  Retention
                  Training    All Plant XYZ process technicians will be trained on the following:
                              0 Introduction to lubrication
                               Constant level oilers
                               Bath-splash oil systems
                               Circulating oil systems
                               Basic operator training and on the job
                               Grease guns and fittings
                               Storage and handling
                  Grease
                  Lubrication   All great-lubricated equipment shall be equipped with grease fittings and grease
                              reliefs. The process technician should verify that each lubricated piece of equipment
                              has been properly equipped. Work orders should be entered for discrepancies.
                  Scheduled
                  Lubrication
                  Process     Below is the urocess for oerformine scheduled lubrication in the Plant XYZ facilities.
                              ~~     ~     ~     ~
                              Step                      Action
                                1   Lubrication scheduled service reports will autogenerate and print from
                                    the Computerized Maintenance Management System.
                               2    The Reliability Specialist picks up the schedule service report(s) and
                                    schedules the work for completion by the due date.
                                3   Each task on the lubrication schedule is initialed and dated by the person
                                    who completes the work. The completed schedule is returned to the Reli-
                                    ability Specialist who closes the primary PPM work order and forwards
                                    the scheduled service reaort to the PM Technician.
                  Work Orders   Work order numbers for scheduled lubrication are autogenerated by the Comput-
                              erized Maintenance Management System.




                                Report Name             Description
                              UAFINFANGREA       Unit “A” - Fin-fan Lubrication
                              UAMTRGREASE        Unit “A Electric Motor Grease
                              U AMTRGREASLR      Load Rack Electric Motor Grease
                              UAOILCHGPMPI       Unit “A” Oil Change for Pumps
                    Unit “A”   UAOILCHGPMPZ      Load Rack Oil Change for Pumps
                              U AAGITOILCHG      Unit “A” Agitator Oil Change
                              UABLOWOILCHG       Unit “A” Blower Oil Change
                              UAGROILCHG         Unit “A” Gear Reducer Oil Change
                              UAMTROILCHG        Unit “A” Motor Oil Change
                              UASEALPOT          Unit “A” Seal Pot Oil Change
                              UASEALPOTLR         Load Rack Seal Pot Oil Change
                  -

                                                                 (ruble continired on next page)