Pulp and paper Chapter  5 99


             5.12.5 Install tubular air heater, flues and ducts

                                                       Installation man-hour
                                                    Historical    Estimate

                                                   MH    Unit  Qty  Unit  BM
             Tubular air heater                                          0
             Tube sheets                           28.00  Ton  0    Ton  0
             Baffle sheets—turn and vibration      60.00  Ton  0    Ton  0
             Supports—tube sheets                  20.00  Ton  0    Ton  0
             Erect grid support steel              28.00  Ton  0    Ton  0
             Supports—main                         18.00  Ton  0    Ton  0
             Tubes—steel                           9.00  Ton   0    Ton  0
             Expand 2 ends                         0.65  EA    0    EA   0
                   00
                      00
             Expand 2-1/2 ends                     0.95  EA    0    EA   0
             Casing, veneer including batten bars and channels  64.00  Ton  0  Ton  0
             Casing, main and hoppers including expansion  60.00  Ton  0  Ton  0
               joints and doors
             Dampers                               40.00  Ton  0    Ton  0
             Flues and ducts                                             0
             Flues and ducts—supports, hoppers, doors,  40.00  Ton  0  Ton  0
               expansion joints, and dampers
             Coupling guards                       14.00  Ton  0    Ton  0


             5.13 Reheat recovery boiler installation man-hours


                                                       Estimated BM  Actual BM
             Erect steam drum, install generating bank and weld tubes,  0  0
               install integral economizers
             Erect headers and panels, furnace wall and roof tubes, weld  0  0
               tubes and panels
             Erect, weld superheater, reheater, supply, riser tubes,  0  0
               downcomers, attemperators
             Smelt spout and hood                      0            0
             Auxiliary boiler support steel and equipment  0        0
             Instrument connection                     0            0
             Tubular air heater                        0            0
             Flues and ducts                           0            0
             Reheat recovery boiler installation man-hours  0       0