136   Industrial process plant construction estimating and man-hour analysis


            8.1.2 Equipment descriptions—Coal-fired boiler pressure parts
            sheet 2


               Boiler-Pressure Parts
               Attemperators (first and second stage)
               Steam drum with internals
               Economizer sections and headers
               Membrane furnace wall panels and individual tubes
               Primary and secondary superheater sections and headers
               Reheat superheater sections and headers
               Furnace arch tubes
               Extended surface tube sections
               Tube wall panels, partial panels, tube panel inserts
               Main steam line
               Down comers, supply, and riser tubes
               Platen secondary superheaters
               Intermediate and final secondary superheaters