7.38 Secondary pipe support installation man hours
Facility—diesel power plant Actual Estimate
Description MH BM IW PF MH
Pipe support 2328 0 0 0 0
AB 1100 0 0 0 0
Equipment installation man-hours 3428 0 0 0 0
7.39 Installation of valves list estimate data
Description MH Unit
00
8 In-line valve flange 11.6 EA
00
0.5 In-line valve NPT 3.8 EA
3 In-line valve flange 4.4 EA
00
1 In-line valve NPT 1.6 EA
00
2 In-line valve sw 2.6 EA
00
1 In-line valve sw 2.6 EA
00
2.5 In-line valve flange 3.6 EA
00
1.5 In-line valve sw 2.6 EA
00
0.375 In-line valve NPT 1.8 EA
00
0.75 In-line valve sw 2.6 EA
00
0.75 In-line valve NPT 1.8 EA
00
4 In-line valve flange 5.8 EA
00
6 In-line valve flange 8.7 EA
00
1.5 In-line valve bw 2.6 EA
00
2 In-line valve bw 2.6 EA
00
2 In-line valve flg’d 2.2 EA