186 Industrial process plant construction estimating and man-hour analysis
8.43 Coal-fired boiler and auxiliary equipment man-hour
breakdown
Actual Estimate
MH BM
Coal-fired boiler installation 0 0
Coal silo and pulverized installation 0 0
Air heater installation 0 0
Selective catalytic reduction unit installation 0 0
FD, ID, primary air fan, and pulverized seal air fan installation 0 0
Bottom ash handling system—installation 0 0
ID, OFA, FD, and over fire ductwork—installation 0 0
Electrostatic precipitator installation 0 0
Structural steel and boiler casing installation 0 0
Coal-fired boiler and auxiliary equipment man-hour breakdown 0 0