186   Industrial process plant construction estimating and man-hour analysis


            8.43 Coal-fired boiler and auxiliary equipment man-hour
            breakdown


                                                             Actual  Estimate
                                                             MH      BM
            Coal-fired boiler installation                   0       0
            Coal silo and pulverized installation            0       0
            Air heater installation                          0       0
            Selective catalytic reduction unit installation  0       0
            FD, ID, primary air fan, and pulverized seal air fan installation  0  0
            Bottom ash handling system—installation          0       0
            ID, OFA, FD, and over fire ductwork—installation  0      0
            Electrostatic precipitator installation          0       0
            Structural steel and boiler casing installation  0       0
            Coal-fired boiler and auxiliary equipment man-hour breakdown  0  0