Solar thermal power plant Chapter 9 207
Historical Estimate
Description MH Qty Unit Qty Unit BM IW MW
Weld condensate 0 0 0
headers
16 Schedule 10 BW CS 12.00 2.00 JT 0.00 JT 0
00
18 Schedule 10 BW CS 13.50 4.00 JT 0.00 JT 0
00
Erect and weld steam 0 0 0
distribution manifolds
Erection of steam 0 0 0
distribution manifolds
Handle/set duct 5.60 7.00 EA 0.00 EA 0
Install platform 6.00 1.00 EA 0.00 EA 0
Install fixed and sliding 1.00 7.00 EA 0.00 EA 0
saddles
Make up stiffener rings 2.00 7.00 EA 0.00 EA 0
Movable ladder 2.00 6.00 EA 0.00 EA 0
Install end plate 4.00 1.00 EA 0.00 EA 0
Weld steam distribution 0 0 0
manifolds
6.5 –8.5 Diameter 5/ 0.30 368.82 LF 0.00 LF 0
0
0
16 FW
00