Page 226 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 226
202 Industrial Process Plant Construction Estimating and Man-Hour Analysis
9.22.4 Street steam duct sheet 4
Description MH Unit
Field assemble street steam duct
Handle 20 –6 diameter duct 10.00 EA
00
0
Handle drain pot 10.00 EA
Erect platform 10.00 EA
Field weld with slip ring .75 BW 1.15 LF
00
Weld duct; 20 –6 diameter .75 WT BW 1.15 LF
0
00
00
Fit up and Weld .75 BW 1.15 LF
00
Install and align embedded plates 8.00 EA
Weld together saddles and weld stiffeners 4.00 EA
Install saddles 4.00 EA
Bolt saddles to foundation 2.00 EA
Place duct sections 10.00 EA
TED-XX handle duct 10.00 EA
Grout support saddles 8.00 EA
Reinforcement pad 1.15 LF
9.22.5 Erect & weld turbine exhaust duct risers sheet 5
Description MH Unit
Erection and welding of turbine exhaust duct risers
Erect duct section, duct with elbow 10.00 EA
Handle duct section, duct section with elbow 10.00 EA
Fit up and weld .75 BW
00
FFW 1.15 LF
FW 1.15 LF
Install and align embedded plates 8.00 EA
Weld together saddles and weld stiffeners 4.00 EA
Install saddles 4.00 EA
Bolt saddles to foundation 2.00 EA