9.23.6 Risers, tanks sheet 6
Historical Estimate
Description MH Qty Unit Qty Unit BM IW MW
Field assemble risers 0 0 0
0
Duct diameter 8 –6 00
Handle TED duct 10.00 0.14 EA 0.00 EA 0
Fit up and weld .75 BW 1.15 6.94 LF 0.00 LF 0
00
Handle 7051RD2 10.00 0.14 EA 0.00 EA 0
Handle 7052RD2 10.00 0.14 EA 0.00 EA 0
Fit up and weld .75 BW 1.15 7.50 LF 0.00 LF 0
00
Expansion joint 8 –6 00 10.00 0.28 EA 0.00 EA 0
0
Handle 7021RD1 10.00 0.14 EA 0.00 EA 0
Handle 7011TE2 and 10.00 0.28 EA 0.00 EA 0
7011EV2 6 –10 00
0
Handle 7011TE1 and 10.00 0.28 EA 0.00 EA 0
7011EV1 6 –10 00
0
Fit up and weld .75 BW 1.15 7.50 LF 0.00 LF 0
00
Handle TED 1 10.00 0.03 EA 0.00 EA 0
Expansion joint 8 –6 00 10.00 0.03 EA 0.00 EA 0
0
Fit up and weld .75 BW 1.15 3.00 LF 0.00 LF 0
00
Handle TED 1 6 –10 00 10.00 0.03 EA 0.00 EA 0
0
Handle 7046RD1 10.00 0.03 EA 0.00 EA 0
Handle 7026RD2 10.00 0.03 EA 0.00 EA 0
Fit up and weld .75 BW 1.15 1.50 LF 0.00 LF 0
00
Expansion joint 8 –6 00 10.00 0.06 EA 0.00 EA 0
0
7026RD1 handle 6–10 00 10.00 0.03 EA 0.00 EA 0
7016TE2 and 7016TE 1 10.00 0.06 EA 0.00 EA 0
0
6 –10 00
7016EV1 and 7016EV2 10.00 0.06 EA 0.00 EA 0
6 –10 00
0
00
Fit up and weld .75 BW 1.15 7.50 LF 0.00 LF 0
Set and assemble shop tanks 0 0 0
Install and align embedded 8.00 0.11 EA 0.00 EA 0
plates
Weld together saddles and 4.00 0.33 EA 0.00 EA 0
weld stiffeners
Install saddles 4.00 0.06 EA 0.00 EA 0
Bolt saddles to foundation 2.00 0.06 EA 0.00 EA 0
Baseplates 2.00 0.06 EA 0.00 EA 0
Set condensate tank 40.00 0.03 EA 0.00 EA 0
Set deaerator tank
3 –11 diameter 20.00 0.03 EA 0.00 EA 0
0
00
8 –6 diameter 20.00 0.03 EA 0.00 EA 0
00
0
Fit up and weld
.5 25 0.75 0.69 LF 0.00 LF 0
00
.5 54 0.75 1.50 LF 0.00 LF 0
00
Perforated plate 20.00 0.06 EA 0.00 EA 0
Wire mesh 20.00 0.06 EA 0.00 EA 0