Page 323 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 323

304 Index


            W                                   erect headers and panels, weld water wall
            Waste heat boiler                     tubes, burner, soot blower, superheater
              boiler casing, 69                   sheet 2, 231
                equipment installation man hours, 78  installation estimate
                estimate data, 77               down comers and code piping sheet 3,
                field work required, 76           75
                installation estimate, 77       drums, generating tubes, headers, side,
              equipment installation man-hours, 75  front and rear panels sheet 1, 73
              estimate data                     erect headers and panels, weld water wall
                down comers and code piping sheet 3, 72  tubes, burner, soot blower, superheater
                drums, generating tubes, headers, side,  sheet 2, 74
                 front and rear wall panels sheet 1, 71  pressure parts, 67–68
                erect headers and panels, weld water wall  structural steel
                 tubes, burner, soot blower, superheater  equipment installation man hours, 78
                 sheet 2, 71                    estimate data, 76
              500,000 lb/h installation estimate  field work required, 76
                down comers and code piping sheet 3, 232  installation estimate, 77
                drums, generating tubes, headers, side,  work-field erection, 70
                 front and rear panels sheet 1, 230  Work sampling method, 273
   318   319   320   321   322   323