Page 323 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 323
304 Index
W erect headers and panels, weld water wall
Waste heat boiler tubes, burner, soot blower, superheater
boiler casing, 69 sheet 2, 231
equipment installation man hours, 78 installation estimate
estimate data, 77 down comers and code piping sheet 3,
field work required, 76 75
installation estimate, 77 drums, generating tubes, headers, side,
equipment installation man-hours, 75 front and rear panels sheet 1, 73
estimate data erect headers and panels, weld water wall
down comers and code piping sheet 3, 72 tubes, burner, soot blower, superheater
drums, generating tubes, headers, side, sheet 2, 74
front and rear wall panels sheet 1, 71 pressure parts, 67–68
erect headers and panels, weld water wall structural steel
tubes, burner, soot blower, superheater equipment installation man hours, 78
sheet 2, 71 estimate data, 76
500,000 lb/h installation estimate field work required, 76
down comers and code piping sheet 3, 232 installation estimate, 77
drums, generating tubes, headers, side, work-field erection, 70
front and rear panels sheet 1, 230 Work sampling method, 273

