Page 320 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 320
Index 301
Process piping. See Piping schedules and tables install L1 secondary steel, platforms sheet
Pulp and paper 4, 190
recovery boiler install L2 secondary steel, platforms sheet
design features, 79 5, 191
estimate data, 82–83 install L3 secondary steel, platforms sheet
fuel, 79 6, 191
installation estimate, 84–87 installation man hours, 192
installation man-hours, 87 work-field erection, scope of, 188
liquor processing capacity, 79 Receiver thermal enclosure
steam pressure, 79 estimate data, 194
steam temperature, 79 installation estimate, 195
work-field erection, scope of, 80–81 work-field erection, scope of, 194
reheat recovery boiler Recovery boiler
design features, 79 design features, 79
estimate data, 92–94 estimate data
fuel, 79 erect drum, generating bank, integral
installation estimate, 95–99 economizers multiple header type sheet
installation man-hours, 99 1, 82
steam pressure, 79 erect headers and panels, furnace wall and
steam temperature, 79 roof tubes, weld tubes and panels sheet
work-field erection, scope of, 88–91 2, 82
PWHT. See Postweld heat treatment (PWHT) erect headers and panels, furnace wall and
roof tubes, weld tubes and panels sheet
R 3, 83
Range method, 274–275 install smelt spout and hood and auxiliary
Receiver cranes, vents and trays boiler support steel and equipment,
estimate data, 197 sheet 4, 83
installation estimate, 197 fuel, 79
installation man hours, 197 installation estimate
work-field erection, scope of, 197 erect drum, generating bank, integral
Receiver heat shield set economizers multiple header type sheet
estimate data, 196 1, 84
installation estimate, 196 erect headers/panels, wall/roof tubes, weld
work-field erection, scope of, 195 tubes and panels sheet 2, 85
Receiver panel assemblies erect super heater, supply/riser down
estimate data, 192–193 comers, attemperators sheet 3, 86
installation estimate, 193–194 install spout and hood and auxiliary boiler
work-field erection, scope of, 192 steel and equipment, sheet 4, 87
Receiver, solar thermal power plant installation man-hours, 87
estimate data liquor processing capacity, 79
assemble and erect core columns and steam pressure, 79
crossbraces sheet 1, 188 steam temperature, 79
secondary steel, platforms and ladders work-field erection, scope of
sheet 2, 188 sheet 1, 80
secondary steel, vertical struts sheet 3, 189 sheet 2, 81
installation estimate Reflectors, solar thermal power plant, 187
assemble and erect L1 core columns and Regression analysis, 1
crossbraces sheet 1, 189 Regression equation, 5, 9–10
assemble and erect L2 core columns and Regression line, 8, 8b,10
cross-braces sheet 2, 189 Reheat recovery boiler
assemble and erect L3 core columns and design features, 79
cross-braces sheet 3, 190 estimate data

