Page 317 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 317

298 Index


            Electrostatic precipitator (Continued)  F
              estimate data                  FD fan
                frames/baffles, collecting plates, hopper  coal-fired power plant
                 auxiliaries, electrodes, hot roof sheet 4,  field assembly and erection, 248–249b,
                 173                              249f
                hoppers, casing/partition frames, support  installation, 248t, 248–249b
                 steel, diffusers, TEF’s and IRB’s sheet  industrial package boiler
                 1, 171                         estimate data, 110
                penthouse, casing, hoppers, weld casing,  installation estimate, 110
                 frames/beams sheet 3, 172      installation man-hours, 111
                penthouse structural steel sheet 7, 175  work-field erection, scope of, 109
                seal air system, dampers, stack, inlet/outlet  FD, ID, primary air fan and pulverized seal
                 plenum sheet 6, 175              air fan
                set plates, rapper rods, Mfg. plates,  equipment descriptions, 138, 162
                 penthouse, diffuser, alignment,  estimate data, 163
                 rectifiers sheet 5, 174       installation estimate, 164
                slide plates, hopper platform, support steel  installation man hours, 165
                 access sheet 2, 172           work-field erection, scope of, 162
              installation estimate
                                             Field erected package boiler
                frames/baffles, collecting plates, hopper
                                               estimate data, 105
                 auxiliaries, electrodes, hot roof sheet 4,
                                               installation estimate, 106
                 179
                                               installation man-hours, 107
                hoppers, casing/partition frames, support
                                               man-hour breakdown, 111
                 steel, diffusers, TEF’s and IRB’s sheet
                                               work-field erection, scope of, 104
                 1, 176
                                             First-order model, 5
                penthouse, casing, hoppers, weld casing,  Forecast values, 14b
                 frames/beams sheet 3, 178   Foreman’s report analysis, 237–239
                penthouse structural steel sheet 7, 181  Function AVERAGE, 19
                perforated plates, rapper rods, Mfg. plates,  Function STDEV, 21
                 penthouse, diffuser, alignment, rectifier  Function VAR, 20
                 set sheet 5, 180
                seal air system, dampers, stack, inlet/outlet  G
                 plenum sheet 6, 181
                                             Graph(s), 2, 239
                set plates, rapper rods, Mfg. plates,
                 penthouse, diffuser, alignment,  Graphical straight line, 3, 8
                 rectifiers sheet 5, 174     Graphic analysis of data, 2–4
                slide plates, hopper platform, support steel  equipment (see Graphic analysis of
                                                  equipment)
                 access sheet 2, 177
                                               histogram, 239
              installation man-hours, 182
                                               process piping (see Graphic analysis of
              work-field erection, scope of, 170–171
                                                  process piping)
            Erect waste heat boiler, 14, 15f
                                               simple moving average forecast, 238
            Excel functions
                                               straight-line graph, 2–4, 3–4b
              correlation, 278
                                               welding condensate headers, 238, 238f
              forecasting, statistical functions, 277
                                             Graphic analysis of equipment
              graphic analysis of data, 277
                                               direct craft man-hour tables, 239
            Excel statistical functions
                                               install FD fan, 245b
              correlation, 11
                                               install pipe modules, 246–247b
              forecasting HRSG module installation, 7–9
                                               waste heat boiler burner system, 244–245b
              time series, 12–15
                                             Graphic analysis of process piping
            Expected profit, 265–267
                                               direct craft man-hour tables, 239
            Expected value method, 274
                                               field bolt up of flanged joints by weight class,
            Exponential smoothing, 275–276
                                                  240–241b
   312   313   314   315   316   317   318   319   320   321   322