Page 317 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 317
298 Index
Electrostatic precipitator (Continued) F
estimate data FD fan
frames/baffles, collecting plates, hopper coal-fired power plant
auxiliaries, electrodes, hot roof sheet 4, field assembly and erection, 248–249b,
173 249f
hoppers, casing/partition frames, support installation, 248t, 248–249b
steel, diffusers, TEF’s and IRB’s sheet industrial package boiler
1, 171 estimate data, 110
penthouse, casing, hoppers, weld casing, installation estimate, 110
frames/beams sheet 3, 172 installation man-hours, 111
penthouse structural steel sheet 7, 175 work-field erection, scope of, 109
seal air system, dampers, stack, inlet/outlet FD, ID, primary air fan and pulverized seal
plenum sheet 6, 175 air fan
set plates, rapper rods, Mfg. plates, equipment descriptions, 138, 162
penthouse, diffuser, alignment, estimate data, 163
rectifiers sheet 5, 174 installation estimate, 164
slide plates, hopper platform, support steel installation man hours, 165
access sheet 2, 172 work-field erection, scope of, 162
installation estimate
Field erected package boiler
frames/baffles, collecting plates, hopper
estimate data, 105
auxiliaries, electrodes, hot roof sheet 4,
installation estimate, 106
179
installation man-hours, 107
hoppers, casing/partition frames, support
man-hour breakdown, 111
steel, diffusers, TEF’s and IRB’s sheet
work-field erection, scope of, 104
1, 176
First-order model, 5
penthouse, casing, hoppers, weld casing, Forecast values, 14b
frames/beams sheet 3, 178 Foreman’s report analysis, 237–239
penthouse structural steel sheet 7, 181 Function AVERAGE, 19
perforated plates, rapper rods, Mfg. plates, Function STDEV, 21
penthouse, diffuser, alignment, rectifier Function VAR, 20
set sheet 5, 180
seal air system, dampers, stack, inlet/outlet G
plenum sheet 6, 181
Graph(s), 2, 239
set plates, rapper rods, Mfg. plates,
penthouse, diffuser, alignment, Graphical straight line, 3, 8
rectifiers sheet 5, 174 Graphic analysis of data, 2–4
slide plates, hopper platform, support steel equipment (see Graphic analysis of
equipment)
access sheet 2, 177
histogram, 239
installation man-hours, 182
process piping (see Graphic analysis of
work-field erection, scope of, 170–171
process piping)
Erect waste heat boiler, 14, 15f
simple moving average forecast, 238
Excel functions
straight-line graph, 2–4, 3–4b
correlation, 278
welding condensate headers, 238, 238f
forecasting, statistical functions, 277
Graphic analysis of equipment
graphic analysis of data, 277
direct craft man-hour tables, 239
Excel statistical functions
install FD fan, 245b
correlation, 11
install pipe modules, 246–247b
forecasting HRSG module installation, 7–9
waste heat boiler burner system, 244–245b
time series, 12–15
Graphic analysis of process piping
Expected profit, 265–267
direct craft man-hour tables, 239
Expected value method, 274
field bolt up of flanged joints by weight class,
Exponential smoothing, 275–276
240–241b