Page 314 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 314

Index


             Note: Page numbers followed by f indicate figures, t indicate tables, and b indicate boxes.




             A                                   installation man-hours, 109
             Air cooled condenser                work-field erection, scope of, 107
               estimate data                   installation estimate, 159
                erect and weld turbine exhaust duct risers  installation man hours, 160
                  sheet 5, 202                 work-field erection, scope of, 158
                IC equipment and street pipe, wind walls,  Area(s)
                  turbine exhaust duct sheet 3, 201  metric conversion, 282
                motor bridge, tube bundles, condensate  metric-standard conversions, 282
                  headers and steam distribution  standard conversions, 282
                  manifolds sheet 2, 200       standard-metric conversions, 282
                pumps, expansion joint, test sheet, 203  of standard normal distribution, 269t
                risers, shop tanks sheet 6, 203  and volume formulas, 279
                street steam duct sheet 4, 202  Arithmetic mean, 19
                structural steel module/fan duct, stairways  Assembly receiver tower IC pipe
                  and walkways, A-frame and fan cowl/  bolt up of flanged joint by weight class sheet
                  screens sheet 1, 199            3, 227
               installation decreased quantities estimate,  field handle valves/specialty items by weight
                  234                             class, 227
               installation estimate           handleandinstallpipe-weldedjointsheet1,225
                erect and weld turbine exhaust duct risers  man hours, 228
                  sheet 5, 211                 pipe supports sheet 5, 228
                pumps, expansion joint, test sheet 7, 213  process piping estimate form, 225
                risers, tanks sheet 6, 212     welding BW, SW, and PWHT—arc uphill
                street steam duct sheet 4, 210    sheet 2, 226
                structural steel module/fan duct, stairways
                  and walkways, A-frame and fan cowl/  B
                  screens sheet 1, 204–205    Bid assurance
                structural steel module/fan duct, stairways  best bid, 265
                  and walkways, A-frame and fan cowl/  capture rate, 267
                  screens sheet 2, 206–207     expected profit, 265–267
                structural steel module/fan duct, stairways  optimum bid, 265
                  and walkways, A-frame and fan cowl/  Boiler man-hour tables
                  screens sheet 3, 208–209     burners, 290t
               installation field erection estimate, 233  cutting and milling rates, 0–5000psi, 283t
               installation increased quantities estimate, 233  diamond sootblowers, 288t
               installation man hours, 214     expanding rates, 284t
               work-field erection, scope of, 198  field pipe welding, 287t
             Air heater                        field tube welding, 285–286t
               equipment descriptions, 137     mill with power tool, 283
               estimate data, 159              saw/grind, mill with power tool rate, 283
               industrial package boiler       socket and seal welding, 284–285t
                estimate data, 108             structural steel, 289t
                installation estimate, 108     Wachs Trav-L-cutter, 283



                                                                         295
   309   310   311   312   313   314   315   316   317   318   319