Page 314 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 314
Index
Note: Page numbers followed by f indicate figures, t indicate tables, and b indicate boxes.
A installation man-hours, 109
Air cooled condenser work-field erection, scope of, 107
estimate data installation estimate, 159
erect and weld turbine exhaust duct risers installation man hours, 160
sheet 5, 202 work-field erection, scope of, 158
IC equipment and street pipe, wind walls, Area(s)
turbine exhaust duct sheet 3, 201 metric conversion, 282
motor bridge, tube bundles, condensate metric-standard conversions, 282
headers and steam distribution standard conversions, 282
manifolds sheet 2, 200 standard-metric conversions, 282
pumps, expansion joint, test sheet, 203 of standard normal distribution, 269t
risers, shop tanks sheet 6, 203 and volume formulas, 279
street steam duct sheet 4, 202 Arithmetic mean, 19
structural steel module/fan duct, stairways Assembly receiver tower IC pipe
and walkways, A-frame and fan cowl/ bolt up of flanged joint by weight class sheet
screens sheet 1, 199 3, 227
installation decreased quantities estimate, field handle valves/specialty items by weight
234 class, 227
installation estimate handleandinstallpipe-weldedjointsheet1,225
erect and weld turbine exhaust duct risers man hours, 228
sheet 5, 211 pipe supports sheet 5, 228
pumps, expansion joint, test sheet 7, 213 process piping estimate form, 225
risers, tanks sheet 6, 212 welding BW, SW, and PWHT—arc uphill
street steam duct sheet 4, 210 sheet 2, 226
structural steel module/fan duct, stairways
and walkways, A-frame and fan cowl/ B
screens sheet 1, 204–205 Bid assurance
structural steel module/fan duct, stairways best bid, 265
and walkways, A-frame and fan cowl/ capture rate, 267
screens sheet 2, 206–207 expected profit, 265–267
structural steel module/fan duct, stairways optimum bid, 265
and walkways, A-frame and fan cowl/ Boiler man-hour tables
screens sheet 3, 208–209 burners, 290t
installation field erection estimate, 233 cutting and milling rates, 0–5000psi, 283t
installation increased quantities estimate, 233 diamond sootblowers, 288t
installation man hours, 214 expanding rates, 284t
work-field erection, scope of, 198 field pipe welding, 287t
Air heater field tube welding, 285–286t
equipment descriptions, 137 mill with power tool, 283
estimate data, 159 saw/grind, mill with power tool rate, 283
industrial package boiler socket and seal welding, 284–285t
estimate data, 108 structural steel, 289t
installation estimate, 108 Wachs Trav-L-cutter, 283
295