Page 319 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 319
300 Index
M hydrotest pipe, 24
Manual butt welds, 24 manual butt welds, 24
Mechanical joint, 53 Olet welds, 24
Metric conversion screwed fittings and valves, 23
areas, 282 socket welds, 24
lengths, 281 stub in weld, 24
volumes, 281 industrial plant piping, 48t
Metric-standard conversions copper piping, 51
areas, 282 cut and prep weld joint, 50
lengths, 281 hydrostatic testing, 49
volumes, 282 PVC piping, 50
Moving averages screwed pipe, 51
estimation of, 275 welding, carbon steel, and socket weld, 49
smoothing of time series, 275 industrial plants, simple foundations for,
55
O oil refinery piping, 25t
field bolt up of flanged joints by weight
Oil refinery
class, 30
piping, 25t
field handle valves/specialty items by
field bolt up of flanged joints by weight
weight class, 31
class, 30
handle and install pipe, carbon steel,
field handle valves/specialty items by
welded joint, 26
weight class, 31
PWHT craft support labor, 29
handle and install pipe, carbon steel,
SOL, TOL, and WOL welding, 28
welded joint, 26
welding butt weld, carbon steel, and
PWHT craft support labor, 29
SMAW, 27
SOL, TOL, and WOL welding, 28
pipe supports and hangers, 56
welding butt weld, carbon steel, and
solar power plant piping, 39t
SMAW, 27
field bolt up of flanged joints by weight
stripper unit (see Stripper unit)
class, 45
Olet welds, 24
field handle valves/specialty items by
Optimal bidding strategy, 267
weight class, 46
handle and install pipe, carbon steel,
P welded joint, 40
Piping schedules and tables PWHT craft support labor, 44
alloy and nonferrous weld factors, 47 SOL, TOL, and WOL welding, 42
diesel power plant piping, 32t welding butt weld, carbon steel, and
field bolt up of flanged joints by weight SMAW, 41
class, 37 welding stub in, 43
field handle valves/specialty items by standard and line pipe, wall thickness, 57
weight class, 38 underground drainage piping, 52t
handle and install pipe, carbon steel, and handle and install pipe and cast iron, 53
welded joint, 33 handle and install pipe and cast iron soil, 53
PWHT craft support labor, 36 handle and install pipe, concrete, and
SOL, TOL, and WOL welding, 35 vitrified clay, 54
welding butt weld, carbon steel, and pipe trench, machine, hand excavation,
SMAW, 34 backfill, and sand bedding, 54
general notes Postweld heat treatment (PWHT)
field erection bolt ups, 23 butt welds, 24
field handling control valves and specialty craft support, 24
items, 23 diesel power plant piping, 36
field handling valves, 23 oil refinery piping, 29
handling and erecting pipe, 23 solar power plant piping, 44

