Page 321 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 321

302 Index


            Reheat recovery boiler (Continued)  Shielded metal arc welding (SMAW), 3t
                erect drum, generating bank, integral  Simple exponential smoothing, 16–18
                 economizers multiple header type sheet  Simple moving average, 12, 14b, 253–255
                 1, 92                       SMAW. See Shielded metal arc welding
                erect headers and panels, furnace wall and  (SMAW)
                 roof tubes, weld tubes and panels sheet  Smoothing factor, 16
                 2, 92                       Smoothing of time series, 12
                erect/weld SH, reheater, supply/riser tube,  Socket welds, 24
                 down comers, attemperators, sheet 3, 93  Solar power plant piping, 39t
                install smelt spout and hood and auxiliary  field bolt up of flanged joints by weight class,
                 boiler support steel and equipment,  45
                 sheet 4, 93                   field handle valves/specialty items by weight
                install tubular air heater, flues and ducts,  class, 46
                 94                            handle and install pipe, carbon steel, welded
              fuel, 79                            joint, 40
              installation estimate            PWHT craft support labor, 44
                erect drum, generating bank, integral  SOL, TOL, and WOL welding, 42
                 economizers multiple header type sheet  welding butt weld, carbon steel, and
                 1, 95                            SMAW, 41
                erect headers, panels, furnace wall, roof  welding stub in, 43
                 tubes, weld tubes and panels sheet 2, 96  Solar power towers, 187
                erect superheater, reheater, riser tube,  Solar thermal power plant
                 down comers, attemperators, sheet 3, 97  air cooled condenser
                install smelt spout and hood and auxiliary  estimate data, 199–203
                 boiler support steel and equipment,  installation estimate, 204–213
                 sheet 4, 98                    installation man hours, 214
                install tubular air heater, flues and ducts,  work-field erection, scope of, 198
                 99                            cranes, vents and trays
              installation man-hours, 99        estimate data, 197
              steam pressure, 79                installation estimate, 197
              steam temperature, 79             installation man hours, 197
              work-field erection, scope of     work-field erection, scope of, 197
                sheet 1, 88                    equipment man hour breakdown, 215
                sheet 2, 89–90                 heat transfer, 187
                sheet 3, 91                    linear concentrating systems, 187
            Risk analysis                      receiver
              contingency, 263                  estimate data, 188–189
              expected-value method, 259–261, 274  installation estimate, 189–191
              quantitative risk analysis, 259   installation man hours, 192
              range method, 274–275             work-field erection, scope of, 188
                to contingency, 263–265        receiver heat shield set
                mean and variance, 261          estimate data, 196
                SCR, exhaust stack silencer, 262  installation estimate, 196
            Risk probability analysis. See Risk analysis  work-field erection, scope of, 195
                                               receiver panel assemblies
            S                                   estimate data, 192–193
            Selective catalytic reduction (SCR)  installation estimate, 193–194
              equipment descriptions, 137       work-field erection, scope of, 192
              estimate data, 160               receiver thermal enclosure
              installation estimate, 161        estimate data, 194
              installation man hours, 161       installation estimate, 195
              work-field erection, scope of, 160  work-field erection, scope of, 194
   316   317   318   319   320   321   322   323