Page 321 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 321
302 Index
Reheat recovery boiler (Continued) Shielded metal arc welding (SMAW), 3t
erect drum, generating bank, integral Simple exponential smoothing, 16–18
economizers multiple header type sheet Simple moving average, 12, 14b, 253–255
1, 92 SMAW. See Shielded metal arc welding
erect headers and panels, furnace wall and (SMAW)
roof tubes, weld tubes and panels sheet Smoothing factor, 16
2, 92 Smoothing of time series, 12
erect/weld SH, reheater, supply/riser tube, Socket welds, 24
down comers, attemperators, sheet 3, 93 Solar power plant piping, 39t
install smelt spout and hood and auxiliary field bolt up of flanged joints by weight class,
boiler support steel and equipment, 45
sheet 4, 93 field handle valves/specialty items by weight
install tubular air heater, flues and ducts, class, 46
94 handle and install pipe, carbon steel, welded
fuel, 79 joint, 40
installation estimate PWHT craft support labor, 44
erect drum, generating bank, integral SOL, TOL, and WOL welding, 42
economizers multiple header type sheet welding butt weld, carbon steel, and
1, 95 SMAW, 41
erect headers, panels, furnace wall, roof welding stub in, 43
tubes, weld tubes and panels sheet 2, 96 Solar power towers, 187
erect superheater, reheater, riser tube, Solar thermal power plant
down comers, attemperators, sheet 3, 97 air cooled condenser
install smelt spout and hood and auxiliary estimate data, 199–203
boiler support steel and equipment, installation estimate, 204–213
sheet 4, 98 installation man hours, 214
install tubular air heater, flues and ducts, work-field erection, scope of, 198
99 cranes, vents and trays
installation man-hours, 99 estimate data, 197
steam pressure, 79 installation estimate, 197
steam temperature, 79 installation man hours, 197
work-field erection, scope of work-field erection, scope of, 197
sheet 1, 88 equipment man hour breakdown, 215
sheet 2, 89–90 heat transfer, 187
sheet 3, 91 linear concentrating systems, 187
Risk analysis receiver
contingency, 263 estimate data, 188–189
expected-value method, 259–261, 274 installation estimate, 189–191
quantitative risk analysis, 259 installation man hours, 192
range method, 274–275 work-field erection, scope of, 188
to contingency, 263–265 receiver heat shield set
mean and variance, 261 estimate data, 196
SCR, exhaust stack silencer, 262 installation estimate, 196
Risk probability analysis. See Risk analysis work-field erection, scope of, 195
receiver panel assemblies
S estimate data, 192–193
Selective catalytic reduction (SCR) installation estimate, 193–194
equipment descriptions, 137 work-field erection, scope of, 192
estimate data, 160 receiver thermal enclosure
installation estimate, 161 estimate data, 194
installation man hours, 161 installation estimate, 195
work-field erection, scope of, 160 work-field erection, scope of, 194

