Page 322 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 322

Index 303


               reflectors, 187                   recycle compressor reciprocating
               solar power towers, 187            sheet 6, 65
             18-8 Stainless steel, 47t           vessels/columns, pressure equipment sheet
             Standard conversions                 1, 62
               areas, 282                      work-field erection, scope of
               volumes, 282                      air coolers, 60
             Standard-metric conversions         column, T-0000 stripper, 59–60
               areas, 282                        compressors, 60
               lengths, 281                      drums, 59–60
               volumes, 282                      fuel gas filter, 60–61
             Statistical and mathematical formulas  heaters, 60
               block of production, total hours prediction,  heat exchangers, 60
                  272                            pumps, 60
               capture rate, 275                 reactors, 60–61
               cost index, 276                Structural steel and boiler casing
               error limits calculation, 273   equipment descriptions, 140
               exponential smoothing, 275–276  estimate data, 184
               least-square line, 272          installation estimate, 185
               linear regression, 272–273      installation man-hours estimated actual,
               mean, variance, and standard deviation,  185
                  271–273                      work-field erection, scope of, 183
               moving averages
                estimation of, 275            T
                smoothing of time series, 275
                                              Time series
               risk probability analysis
                                               component movements, 12
                expected value method, 274
                                               excel functions, 12–15
                range method, 274–275
                                               simple exponential smoothing, 16–18
               sample size calculation, 273
                                               simple moving average, 12
               work sampling method, 273
             Statistical inference, 237
             Straight line fitting, 5         U
             Straight-line graph, 2–4         U learning model, 255
             Straight line man-hour quantity, 8t  block of production, total hours, 256
             Stripper unit                     system for measuring slope, 256
               data estimation                 unit (U) model, 255
                filter and reactor sheet 5, 62  waste heat boiler erection, 256–257b,
                heaters, heat exchangers, and air coolers  257–259
                  sheet 3, 61                 Underground drainage piping, 52t
                horizontal vessels, pressure equipment  handle and install pipe and cast iron, 53
                  sheet 2, 61                  handle and install pipe and cast iron soil, 53
                pump, centrifugal sheet 4, 62  handle and install pipe, concrete, and vitrified
                vessels/columns, pressure equipment sheet  clay, 54
                  1, 61                        pipe trench, machine, hand excavation,
               equipment installation man-hours, 65  backfill, and sand bedding, 54
               estimation
                filter and reactor sheet 5, 64  V
                heaters, heat exchangers, and air coolers  Volumes
                  sheet 3, 63                  metric conversion, 281
                horizontal vessels, pressure equipment  metric-standard conversions, 282
                  sheet 2, 63                  standard conversions, 282
                pump, centrifugal sheet 4, 64  standard-metric conversions, 282
   317   318   319   320   321   322   323