Page 318 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 318

Index 299


               handle and install pipe, cast iron soil-no hub,  bolt up of flanged joint by weight class
                  242–243b                        sheet 3, 227
               handle valves by weight class, 243–244b  field handle valves/specialty items by
               hydrotest pipe, 241–242b           weight class, 227
               straight-line graph, 239          handle and install pipe-welded joint sheet
                                                  1, 225
             H                                   man hours, 228
             Heat transfer, solar thermal power plant, 187  pipe supports sheet 5, 228
             HRSG module installation, 7–9       process piping estimate form, 225
             Hydrotest pipe, 24                  welding BW, SW, and PWHT—arc uphill
                                                  sheet 2, 226
                                               comparison and graphic analysis of data,
             I                                    234–235
             Industrial package boiler         field erection fan inlet cowl and fan screens,
               air heater                         222–224
                estimate data, 108             process plant labor estimation, 222
                installation estimate, 108     sample equipment estimate estimates, 229
                installation man-hours, 109    waste heat boiler (see Waste heat boiler)
                work-field erection, scope of, 107
               A-type package boiler, 101
               D-type package boiler, 101     L
                estimate data, 102            Lead joint, 53
                installation estimate, 103    Learning curve in construction
                installation man-hours, 103    linear regression, fitting U model, 257–259
                work-field erection, scope of, 102  power equation, 255
               FD fan                          regression analysis, 255
                estimate data, 110             U learning model, 255
                installation estimate, 110       block of production, total hours, 256
                installation man-hours, 111      system for measuring slope, 256
                work-field erection, scope of, 109  unit (U) model, 255
               field erected package boiler      waste heat boiler erection, 256–257b,
                estimate data, 105                257–259
                installation estimate, 106    Least-square line, 5–7, 272
                installation man-hours, 107   Least-squares and regression
                man-hour breakdown, 111        equipment, 247
                work-field erection, scope of, 104  coal-fired power plant, 248–250b
               modular design, 101               diesel power plant, 247–248b
               O-type package boiler, 101      process piping
             Industrial plant piping, 48t        diesel power plant, 252–253b
               copper piping, 51                 handle and install PVC pipe, 251b
               cut and prep weld joint, 50    Least squares method, 5–7
               hydrostatic testing, 49        Lengths
               PVC piping, 50                  metric conversion, 281
               screwed pipe, 51                metric-standard conversions, 281
               welding, carbon steel, and socket weld, 49  standard-metric conversions, 281
             Industrial process plant construction estimating  Linear concentrating systems, 187
                  process, 221                Linear regression
               air cooled condenser installation  assumptions, 5
                decreased quantities estimate, 234  fitting straight line, 5
                field erection estimate, 233   fitting U model to unit historical data,
                increased quantities estimate, 233  272–273
               assembly receiver tower IC pipe  regression equations, elements of, 5
   313   314   315   316   317   318   319   320   321   322   323