Page 316 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 316
Index 297
Correlation, 278 estimate, 121
coefficient of determination, 10 estimate data, 121
correlation coefficient, 10 man-hours, 122
excel functions, 11 secondary pipe support
Correlation coefficient, 10–12 estimate, 129
Cost index, 276 estimate data, 129
man hours, 130
D utility gas heating system installation
Descriptive statistics, 237 estimate, 126
Diesel power plant estimate data, 126
cooling system (A10) installation man hours, 126
estimate, 123 utility water installation
estimate data, 122 estimate, 129
man-hours, 123 estimate data, 128
engines and aux platforms (A3) man hour, 129
data, 116 valves list installation
estimate data, 115 estimate, 131
installation man-hours, 116 estimate data, 130
man-hour, 131
engines, couplings, and generators (B2)
work-field erection, scope of, 114
estimate, 114
Diesel power plant piping, 32t
estimate data, 114
fieldboltupofflangedjointsbyweightclass,37
installation man hours, 115
field handle valves/specialty items by weight
exhaust gas system (A11)
class, 38
estimate, 119
handle and install pipe, carbon steel, and
estimate data, 118
welded joint, 33
installation man-hours, 120
PWHT craft support labor, 36
fire water system (A14) installation
SOL, TOL, and WOL welding, 35
estimate, 125
welding butt weld, carbon steel, and SMAW,
estimate data, 125
34
man hours, 126
D-type package boiler, 101
intake air system (A11) installation
estimate data, 102
estimate, 124
installation estimate, 103
estimate data, 124
installation man-hours, 103
man hours, 125
leaking channel set work-field erection, scope of, 102
estimate, 132 Ductwork and breeching
estimate data, 132 equipment descriptions, 141
installation man hour, 133 estimate data
lube oil system (pump and tanks) installation ID, FD and primary air ductwork sheet 2,
estimate, 127 167
estimate data, 127 over fire ductwork sheet 2, 167
man-hour, 128 installation estimate
man hour breakdown, 133 ID,FDandprimaryairductworksheet1,168
manometer/thermometer list installation over fire ductwork sheet 2, 169
estimate, 132 installation man hours, 169
estimate data, 132 work-field erection, scope of, 166
man hour, 132
pipe modules (B3) installation E
estimate, 117 Electrostatic precipitator
estimate data, 117 equipment descriptions
man-hours, 117 sheet 1, 139
SCR and urea system (A13) installation sheet 2, 140

