Page 43 - Industrial Process Plant Construction Estimating and Man Hour Analysis
P. 43

Introduction to construction statistics using Excel Chapter  1 13



                Excel statistical functions are used to calculate values for data. Set up Tem-
                plate 1.
                To produce the values, insert the formulas 5AVERAGE (D297-D299),
                5ABS (D300-E300), ¼(D300-E300)^2 in cells F619, G619, and H619,
                respectively. Insert the ¼AVERAGE (F299-F04) for MAE (cell F307)
                and ¼AVERAGE (G299-G304) for MSE (cell G307); then, highlight

                the range E300-FG04 and press Ctrl-D.
   38   39   40   41   42   43   44   45   46   47   48