Page 353 - Intelligent Digital Oil And Gas Fields
P. 353

296                                       Intelligent Digital Oil and Gas Fields


             Phase 1: Enable pump by exception
          •  data integrity and cleanup
          •  production surveillance operations with basic dashboard and rationalized
             reporting
          •  production surveillance engineering dashboard for well surveillance
          •  alarm rationalization
          •  basic intelligent alarms and data validation and conditioning
          •  basic well pad automation evaluation
          •  collaboration evaluation
             Phase 2: Enable integrated production operations
          •  advanced integrated production operations (IPO) dashboards
          •  automated well review by exception and by well priority and make well
             review on demand
          •  alerts for wells producing or not
          •  automated downtime code analysis and volumes
          •  intelligent alarms (leaks, predictive maintenance)
          •  in-line/real-time data validation, cleanup, and conditioning (SCADA
             data, PVT, and BTU calculations)
          •  field notes/text notes system upgrade and rationalization
          •  ticket system for field interventions
          •  basic well pad regulatory control (choke, gas lift)
             Phase 3: Enable collaborative optimization
          •  collaboration protocols established
          •  virtual metering in place
          •  advanced, automated well reviews
          •  target setting (subsurface collaboration)
          •  automated gas lift optimization/opportunity notifications with predic-
             tive analytics suggestions and data-driven models
          •  automated rod pump optimization/opportunity notifications with pre-
             dictive analytics suggestions and data driven models
          •  flare management
          •  facilities automation
          •  advanced human–machine interface (HMI) design
             Phase 4: Enable (or at least work toward) “closed-loop” asset optimiza-
             tion including production, operations, and reservoir
          •  closed-loop optimal regulation and capacity management
          •  facility scheduling and balancing
          •  daily route optimization
          •  integrated field planning and delivery
          •  production downtime sheltering
   348   349   350   351   352   353   354   355   356   357   358