Appendix  3-B

                                Specification for  Portland

                             Cement Gro~ting of  Rotating

                                              Equipment





                          I.  SCOPE
                              1.   THIS   SPECIFICATION  COVERS  PORTLAND  CEMENT  GROUTING
                                  OF  MECHANICAL  EQUIPMENT  ON  CONCRETE  FOUNDATIONS.
                         11.  MATERIALS
                              1.   PORTLAND  CEMENT  SHALL  CONFORM  TO  ASTM  C-150.
                              2.   FILLER   SAND  AGGREGATE  SHALL  CONFORM  TO  ASTM  c-33
                                  FINE  AGGREGATE,
                              3.   ONLY  CLEAN,  FRESH  WATER  SHALL  BE  USED  IN   PREPARING
                                  THE  GROUT.
                              4.   ALL  MATERIALS  SHALL  BE  STORED  INDOORS  AND  KEPT  DRY,
                                  FREE  OF  MOISTURE  IN  ITS  OWN  ORIGINAL  SHIPPING  CON-
                                  TA I NERS ,
                              5.   STORAGE TEMPERATURE  SHALL  BE  MAINTAINED   BETWEEN 40'F
                                  AND  90.F.   GROUTING   SHALL  NOT  BE  DONE  DURING  FREEZ-
                                  ING  WEATHER.
                        111.  PREPARATION  OF  FOUNDATION
                              1.   FOUNDATION  BOLT  THREADS  SHALL  BE  EXAMINED  FOR
                                  STRIPPED   OR  DAMAGED  THREADS.  THESE  THREADS  SHALL
                                  BE  RE-CHASED  TO  CLEAN-UP  OR  THE  FOUNDATION  BOLTS
                                  REPLACED  IF  NECESSARY,   THE  FOUNDATION  BOLTS  AND
                                  THEIR  THREADS  SHALL  BE  PROTECTED  DURING  THE  LEVELING
                                  AND  GROUTING  OPERATIONS.
                              2.   THE  CONCRETE  FOUNDATION  SHALL  BE  DRY  AND  FREE  OF
                                  OIL.   IF  OIL  IS PRESENT  IT SHALL  BE  REMOVED  WITH
                                  SOLVENT  PRIOR  TO  CHIPPING.
                              3.   THE  CONCRETE  SHALL  BE  CHIPPED   TO  EXPOSE  ITS   AGGREGATE,
                                  APPROXIMATELY  1/2  INCH  DEEP  SO  AS  TO  REMOVE  ALL
                                  LAITACE  AND  PROVIDE  A  ROUGH  SURFACE  FOR  BONDING.
                                  LIGHT  HAND  TOOLS  SHALL  BE  USED  IN CHIPPING.
                              4.   AFTER  CHIPPING,   THE  EXPOSED  SURFACE  SHALL  BE  BLOWN
                                  FREE  OF  DUST  USING  OIL-FREE  COMPRESSED  AIR  FROM  AN
                                  APPROVED  SOURCE.