Page 86 - Mathematical Models and Algorithms for Power System Optimization
P. 86
76 Chapter 3
3.7.1 Input Data of a Real Scale System
Basic calculation conditions are listed in Table 3.11.
Table 3.11 Basic calculation conditions
Item Number
Number of areas 4
Number of power plants 9
Number of units 55
Unit capacity (MW) and 12 14
number of units 12.5 2
25 14
40 1
50 10
100 2
200 9
300 1
350 2
Total capacity: 4083MW
Some points of forecast loads are shown in Table 3.12.
Table 3.12 Some forecast load with step points (MW)
Hydropower
Date Load Output Power Exchange Reserve Capacity
1994-01-01 3800 450 120 40
1994-01-24 3800 450 120 40
1994-02-01 3800 450 120 40
1994-02-09 4000 450 120 40
1994-02-10 3700 450 120 40
1994-02-20 3800 450 120 40
1994-03-01 4100 450 120 40
1994-04-01 4200 450 120 90
1994-05-01 4200 450 120 90
1994-06-01 4100 450 120 90
1994-06-12 3900 450 120 90
1994-06-26 4000 450 120 90
1994-07-01 4100 450 120 120
1994-08-01 4100 450 120 120
1994-09-01 4000 450 120 120