FIGURE 26-23
FPZ BOM with lengths of all legs indentified.
Bill of Material for Part FPZ (Displayed Horizontally)
PPA
18 5
PPK
43 20
PPJ
46
20
SAC SAX
3 4
PPI SAZ
58 25 7
136 PPH SAF FPZ
75
6 13
SAA PPD
5 52 18
SAD
101 PPG 15
40
PPF SAB SAW
71 15 10 12
76 PPE 71 PPC SAY SAE
20 25 20 13
PPB
41 15
FIGURE 26-24 Downloaded by [ Singapore Polytechnic Library 176.79.113.174] at [06/05/21]. Copyright © McGraw-Hill Global Education Holdings, LLC. Not to be redistributed or modified in any way without permission.
FPZ BOM with time buffers on feeding orders and/or paths.
Bill of Material for Part FPZ (Displayed Horizontally)
18 PPA
5
PPK
48
20
51 PPJ
20
SAC SAX
3 4
PPI SAZ
64 25 7
136 PPH SAF FPZ
75
6 13
SAA PPD
5 57 18
SAD
111 PPG 15
40
PPF SAB SAW
75 15 10 12
81 PPE 86 PPC SAY SAE
20 25 20 13
Buffer protecting
entire path
Buffer size = 25% of lead time of 56 PPB
activity or path being buffered 15