Page 420 - Pipeline Risk Management Manual Ideas, Techniques, and Resources
P. 420

Index 395
               System safety factor (.we also Safety)     Vacuum extraction  53
                 I20                                      Value
               System strength  94                         added work  18
                                                           of human life (see ulso Fatalities)  347
                                                           of mitigation (see Mitigation)
               Tanks  260.285                             Vahes
               Technique, choosing  16                     automatic (see 0150 Automatic)  162
               Temperature (see &<I   Streas) 21 I, 365    causing surges (see Surge)
               Terrain conductivity (see Soil)             check valve (see Check)
               Test leads (see Cathodic protection,        reliefv  (see Relief)
                 Pipe-to-soil potential, Inspection)       remote v  (see Remote)
               Tests                                       SpdClng  of  163
                Charpy(seeu/ro Charpy)  143                three-way  131
                model performance (see Model)             Vandalism (see Sabotage)
                nondestructive (see NDT)                  Vapor
                pressure (hydrostatic) 30, 108-9,379,3X2   clouds (seealro Clouds)  135. 149.307.309
               Thermal damage potential  146               dispersion  309
               Thermal effects  152-3.173                  releases  146
               Thermal radiation (see aisri Fire. Bum radius)   toxic  142. 150-1
                 138.306-9                                Variability
               Third-party damage  28.40,13-54,93,         variation  8, 10-1. 190
                 I 18, 383                                Variables  (see Risk)
                distribution systems  227-34              Vehicles (see Traffic)
                exposure                                  Vibration monitoring  276,279
                facilities  282-3                         Visual (see Inspections)
                hit rate  45                              Volumes (see Spill size)
                mitigation analysis  57-60                Vortex shedding  250-1
                offshore  244-7
                stations  282-3,  173
               Threat assessment (see Sabotage)           Wall thickness  94,98,383
               Toughness, ofpipe (.see Fracture mechanics)   probability failure  298
               Toxicily  138-42                           Warning tape. mesh  46-7
               Toxicological risk assessment  16. 142     Waste (see Quality)
               TQM (Total Quality Management,             Water crossing surveys  (see Surveys)
                 see Quality)                             Water hammer (see Surge)
               Traffic  266.283                           Wave action  168,250-2
               Training  30,  129-31.218.270-1            Weather  267.282
               Tsunamis  113,250                          Weighting  25,32,33
                                                          Welding (see Joining)
                                                          Wetlands  168, 327.377
               UFL(upperflammabi1ity limit)  149          What-iftrials  186. 196
               Ultrasonic ILI (see ILI)                   Wildlife (.reeAnimal attack)
               Unaccounted for gas  225                   Workplace stressors (see Stressors)
               Uncertainty  8,25.333
               Unconfined vapor cloud explosion
                 (see Cloud Vapor cloud)                  X-ray (see Inspection)
               Uniform color code  53
               Upper flammability limit (see UFL)
               [Jpsrt potential  12,21 I                  Zone-of-Influence 35.180-1
   415   416   417   418   419   420   421   422   423   424   425