Page 419 - Pipeline Risk Management Manual Ideas, Techniques, and Resources
P. 419

394 Index
            RTU (remote terminal unit)  126            Specified minimum yield strength (see SMYS)
            Rupture (see Hole size)                    Spending prioritization (see also Cost)  343
                                                       Spill (see also Leak, Release)  142, 147
                                                        adjustments to size  159-65
            Sabotage (see also Incorrect operations)  200-206   migration  153-4
             attack potential  201                      offshore 255
             distribution systems  240                  poolsize  151-3
             mitigations (see also Mitigations) 202     score  104,146
             potential for (see Potential threats)      size  148-59,240-1,272,312-29
            Safety                                     Spill limiting actions (see also Spill)
             facilities  268                            offshore 255
             factor  94-102,236,250                    SQL (structured query language)  179
             programs  128                             SSCC (sulfide stress corrosion cracking)  103
             systems  119-23,238,279,383               Staffing levels and leak detection  272
            SCADA (supervisory control and data acqulsition)  120, 1264,238,257,   Standard deviation  190
               270,281,383                             State soil geographic (see STATSGO)
            SCC (stresscorrosioncracking) 78,103,383   Stations  (see Facilities)
            Scientific method  2                       Statistics 5, 189-92
            Scope  13                                  STATSGO (state soil geographic)  77.78
            Scoring  182                               Steel, carbon (seealso Fatigue)  234
             algorithms  39                            Steel mills  99
             corrosion  65-90                          Strain gauge (see also Land movement)  1 14-5
             data  182                                 Stress  144-5, 197-200,363,383
             releases  154-65                           concentrations 366
             risks  33,94-1 IO                          corrosion cracking (see SCC)
             service interruption 220                   human errors (see also Human errors)  197-8
             surge potential  104                       hydrogen stress corrosion cracking (see HSCC)
            Scour  113                                  hydrostatic test (seeTest)
            Screening analysis  I5                      levels and fatigue (see Fatigue)
            Seabed stability  252                       longitudinal 364
            Secondarycontainment  142,148,154,          MAOP (see MOP)
              272,383                                   materials (see Materials)
            Sectioning (see Segmenting)                 riser  366
            Security forces  282                        soil movement (see Soil, Land movement)
            Segmenting  10,22,26, 102, 178,226,         temperature 2 1 I, 365
              260-1                                     tensile  364
             data  181                                  wall thickness calculations 99
             distribution systems  226                 Stress corrosion cracking (see SCC)
             manually establishing 26                  Stressors, workplace  197-8
             risk  323                                 Structured query language (see SQL)
            Seismic  112-3,254,383                     Subjective risk assessment  16
            Seismograph activity 48-9                  Subsurface corrosion (see Corrosion)
            Sensing devices  163                       Successive reactions 267
            Sensitivity analysis  195-6                Sulfates  72,211-2
            Service interruption  209-22,263           Sulfide stress corrosion cracking (see SSCC)
            Setbackdistances 311-12                    Superfund (see CERCLA)
            Shear  363                                 Supervisory control and data acquisition  (see SCADA)
            Signal-to-noise ratio  333                 Supports 66
            Signs  51,54,245,247                       Surge  250,383
            S-lay offshore pipe installation technique  253   potential  30, 104-5,236,250,268
            Smart pig (see Pigging)
            SMYS (specified minimum yield strength) 78,364,383   pressure calculations  367-8
                                                        pressures. (pressure spike)  104,367
            Sniffers  160                               water hammer (pressure s.)  104,367
            Societal versus individual risk  335-6     Surveillance (see Patrol)
            Software (see Computer)                    Surveys (see also CIS, DCVG, Inspections) 29-30, 128-9
            Soil                                        airpatrol  128
             conditions 26,30,36                        close interval (see CIS)
             conductivity 53                            coating condition  128
             corrosivity  76-8                          holiday detection (coatings)
             movement (see Land movement)               leak (see also Leak)  380
             permeability  26,157                       line locating (see Line locating)
             pH  77,78                                  pigging (see also Pigging)  128
             resistivity 77,85                          polarization  81-2
             settling  111
             shrinking  111                             population density (see also Population density)  128
                                                        route  93
             spill penetration  147                     soil movements (see Soil, Land movements)
             swell  11 1                                subsea(sonar)profile  128,251
            Sourgas  328-9                              thermographic  128
            Spans  96                                   watercrossings  128,380
            Spatial analyses  18 1
            Special loadings  94                       System integrity
                                                        distribution system  225
            Specifications  21 1-3                     System losses
             pipe (see SMYS)                            distribution system 225
   414   415   416   417   418   419   420   421   422   423   424