Page 416 - Pipeline Risk Management Manual Ideas, Techniques, and Resources
P. 416

Index 391
               Facilities (see also Aboveground)  100,257-92   Housekeeping and human error  128
               Failure  4.301.314,382                     HPA (high population area)  166
               Failure modes (see also FMEA)  99          HRS (hazard ranking system)  152
               Failure modes and effects analysis (see FMEA)   HSCC (hydrogen stress corrosion cracking)  77-8
               Failure probability (see abo Failure rate)  299-302, 3 14,320   Hueristics  3 1-2
               Failure rate  5-7,294-8.312-6,319-20       Human error (see also Procedures for prevention, Incorrect operations)  I  17-
               Failure investigation (see Inspection)       8, 197-200,265,278,280-2
               Fatalities(seealsoValueofhuman life)  295-6,305-6,321,355,375   Human life, value of(see Value ofhuman life. Fatalities)
               Fatigue  102-4, 143,234,236,250,268,382    Humidity
               Fault treeanalysis  14,25                  HVA (high value area)  168
               FBE (fusion bonded epoxy)  78              HVL(highlyvolatileIiquid) 147-8,259,272,311.340
               Fences(see Barriers)                       Hydrogen embrittlement (see HIC, HSCC)
               Firelignition scenarios (see alsoTherma1 radiation)  135, 149,272,309   Hydrogen stress corrosion cracking (see HSCC)
                probability  302-4                        Hydrostatic pressure test (see Test)
               Fixed length segmentation (seeah Sectioning)  26, 181
               Flammability limits (seealso Ignition)  359
               Flange  101                                IA (intervention adjustment)  2 16-9
               Flash point  I37                           Ice, scour from  254
               Flashing fluids(seealso HVL)  361-2        Ignition (see also Fire)  302-4
               Flexible pipe  235                         ILI (in-line inspection; see also Inspections)  34-590,379,382
               Flowpath modeling  148                     Impact resistance (see Coating)
               Fluidmodulus  367                          Impressed current (see CP)
               FMEA (failure modes and effects analysis)  14   Incorrect operations (see also Human error)
               Fracture mechanics  143-6,366                40,44, 102, 117-32
               Fracture toughness  102-4, 143-6,382        distribution systems  237
              Fractures (seealso Cracks)  102-4, 1 IO,  143   facilities  268-71
              Frequency  5,32,319                          index  1 17- 132,205.237
               Frost heave  1 12                           offshore systems  253-5
               Fusion bonded epoxy (see FBE)               sabotage  205
              Fuzzylogic  3                               Index sum  40,44,240,299-300.382
                                                         lnducedcurrent (AC)  83
                                                         Inductive reasoning  2-3
              Galvanic corrosion (see Corrosion)         Information degradation  3 1,64
              Gas release (see Release)                  Inhibitor (see Internal corrosion)
              Gas Research Institute (see GRI)            Injuries (see Fatalities)
              Gas spill (see Spill)                      In-line inspection (see ILI; see also Inspections)
              Geographic information system (see CIS)    Inspection (seealso Survey)  124
              CIS (geographic information system)  179     age  31, I05
              Global positioning system (seeGPS)           construction
              GPS (global positioning system)  53,179      degradation (see Information degradation)
              Gravity flow pipe (see Concrete pipe)        internal (see  olso Pigging)  107
              GRI (Gas Research Institute)  45,306,369     sabotage potential (see Sabotage)
              Ground'air interface  66                     techniques  379
              Ground-penetrating radar  53                 visual  36,380
              Groundwater (see Contamination)            Integrity
                                                           assessments  29, 109-10
                                                           verification  100, 105-10,236-7.250.268
              Handling, during installation  125
              HAZ (heat affectedzone)  103-4.382         Insulation  66
              Hazard  I  10.5,  136-42.281.382           Intelligence gathering (see Data)
                                                         Intelligent pigging (see Pigging)
               definition  3
                identification  I19                      Interference currents  82-5
               natural  110-1 12,250-3                   Internal corrosion (see Corrosion)
               zone  1724,306-16                         Internal inspection (see Inspection)
              Hazard and operability study (see HAZOP)   Internal inspection tool (see Inspection)
                                                         Internal pressure  94
              Hazard ranking system (see HRS)            Intervention adjustment (see JA)
              HAZOP (hazard and operability study)  14,25   Interview data  3 1
              HCA (high consequence area)  166           1R drop (see also Corrosion)  79-80
              HCL (high-low-close) chart  I92
              Heat affected zone (see HAZ)
              Heat ofcombustion  359,272,155             Jet fire (see also Fireiignition scenarios)  149,308
              Heat flux  (see Thermal radiation)         J-lay offshore pipe installation technique
              HlC (hydrogen induced cracking)  78, I03   JNA bob needs analysis)  270
              High consequence area (see HCA)            Joining ofmatenals  124
              High population area (see HPA)             Joints (joining)  124,234-5,382,383
              High value area (see HVA)                  JSA (job safety analysis)  270
              High-low-close (see HCL)                   ITA Qob training analysis)  270
              Highly volatile liquid (see HVL)
              Histogram (see abo Frequency)  190
              Historic areas  170                        Key-lock sequence programs  13  1
              Hole size (see also Materials, Fracture mechanics, Charpy test, Spill size,
                 Rupture, Cracks, Stress)  142-6.303.314-5
              Holiday (see Coating defect)               Lacustnne regions  168
              Holiday detection (Are Coatings, Inspection)   LakeTravis  327,377
   411   412   413   414   415   416   417   418   419   420   421