Page 74 - Pipeline Rules of Thumb Handbook
P. 74

Construction  61









           Figure 5. Radiographs of porosity.










           the root spacing. Within limits, this can be fairly effective. For  A skillful line-up crew can be helpful in juggling the root
           example:                                              spacing to bring about the most favorable results, but this has
                                                                 limitations. And it is at best a poor substitute for a uniform
                                                                 and consistent joint preparation.
           Condition                   Change in Root Spacing
           Land too small.              Decrease root spacing.                    Internal chamfer
           Land too large.              Increase root spacing.
           High-low condition.           Decrease root spacing.    It is important to remove any burr or overhang on the
           Bevel too small.             Increase root spacing.   inside edge of the pipe after the root face has been machined



































           Figure 6. Recommended joint preparation and
           typical procedures—operate within these toler-
           ances to help ensure good quality welds.
   69   70   71   72   73   74   75   76   77   78   79