Page 9 - Pipeline Rules of Thumb Handbook
P. 9

NAPCA specifications  . . . . . . . . . . . . . . . . . . . . . . . . 188  HVDC effects on pipelines  . . . . . . . . . . . . . . . . . . . . 214
         How much primer for a mile of pipe?  . . . . . . . . . . . . 191  Troubleshooting cathodic protection systems:
         How much coal-tar enamel for a mile of pipe? . . . . . . 192  Rectifier ground bed  . . . . . . . . . . . . . . . . . . . . . . . 218
         How much wrapping for a mile of pipe?  . . . . . . . . . . 192  How to control corrosion at compressor stations . . . . . 219
         Estimating coating and wrapping materials required    Project leak growth  . . . . . . . . . . . . . . . . . . . . . . . . . . 220
            per mile of pipe . . . . . . . . . . . . . . . . . . . . . . . . . . . 192
         Coefficient of friction for pipe coating materials . . . . . 193  Advances in Pipeline Protection  . . . . . . . . 221
         Troubleshooting cathodic protection systems:          Methods of locating coating defects  . . . . . . . . . . . . . . 222
            Magnesium anode system  . . . . . . . . . . . . . . . . . . . 195  Case histories  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 225
         Cathodic protection for pipelines  . . . . . . . . . . . . . . . . 196  Estimate the number of squares of tape for pipe
         Estimate the pounds of sacrificial anode material         coating (machine applied)  . . . . . . . . . . . . . . . . . . . 226
            required for offshore pipelines . . . . . . . . . . . . . . . . 204  Estimate the amount of primer required for tape . . . . 227
         Comparison of other reference electrode potentials    Tape requirements for fittings  . . . . . . . . . . . . . . . . . . 227
            with that of copper-copper sulfate reference
            electrode at 25°C  . . . . . . . . . . . . . . . . . . . . . . . . . 206  Induced AC Voltages on Pipelines May
         Chart aids in calculating ground bed resistance and      Present a Serious Hazard . . . . . . . . . . . . 228
            rectifier power cost  . . . . . . . . . . . . . . . . . . . . . . . . 207
         How can output of magnesium anodes be
            predicted? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 208  Measuring Unwanted Alternating
         How to determine the efficiency of a cathodic             Current in Pipe  . . . . . . . . . . . . . . . . . . . . 230
            protection rectifier . . . . . . . . . . . . . . . . . . . . . . . . . 208  Minimizing shock hazards on pipelines near HVAC
         How to calculate the voltage drop in ground bed          lines  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 235
            cable quickly  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 209
         What is the most economical size for a rectifier
            cable?  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 209
         How to estimate the number of magnesium anodes        9: Gas—General, 237
            required and their spacing for a bare line or for a  Know the gas laws  . . . . . . . . . . . . . . . . . . . . . . . . . . . 238
            corrosion “hot spot” . . . . . . . . . . . . . . . . . . . . . . . . 210  Calculate gas properties from a gas analysis  . . . . . . . . 240
         How can resistivity of fresh water be determined      Physical properties of selected hydrocarbons and
            from chemical analysis?  . . . . . . . . . . . . . . . . . . . . . 210  other chemicals and gases  . . . . . . . . . . . . . . . . . . . 244
         What will be the resistance to earth of a single      Nomograph for calculating density and specific
            graphite anode? . . . . . . . . . . . . . . . . . . . . . . . . . . . 211  volume of gases and vapors  . . . . . . . . . . . . . . . . . . 252
         How to estimate the monthly power bill for a cathodic
            protection rectifier . . . . . . . . . . . . . . . . . . . . . . . . . 211  Considerations for Selecting Energy
         What will be the resistance to earth of a group of       Measurement Equipment . . . . . . . . . . . . 253
            graphite anodes, in terms of the resistance of a
            single anode? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 211  Facts about methane and its behavior  . . . . . . . . . . . . 259
         How can the current output of magnesium rod used      Conversion table for pure methane  . . . . . . . . . . . . . . 263
            for the cathodic protection of heat exchanger shells   Categories of natural gas and reserves terminology . . . 264
            be predicted?  . . . . . . . . . . . . . . . . . . . . . . . . . . . . 211  Glossary of common gas industry terms  . . . . . . . . . . . 265
         What spacing for test leads to measure current on a
            pipeline?  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 211
         How many magnesium anodes are needed for              10: Gas—Compression, 268
            supplementary protection to a short-circuited bare
            casing?  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 212  Compressors  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 269
         Group installation of sacrificial anodes  . . . . . . . . . . . . 212  Performance calculations for reciprocating
         How can the life of magnesium anodes be                  compressors  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 270
            predicted? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 213  Estimating suction and discharge volume bottle sizes
         How to find the voltage rating of a rectifier if it is to   for pulsation control for reciprocating
            deliver a given amount of current through a given     compressors  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 272
            ground bed (graphite or carbon)  . . . . . . . . . . . . . . 213  Compression horsepower determination . . . . . . . . . . . 274
         Determining current requirements for coated lines  . . 213  Generalized compressibility factor  . . . . . . . . . . . . . . . 276
         Determining current requirements for coated lines     Nomograph aids in diagnosing compressor cylinder
            when pipe-to-soil potential values are estimated . . . 213  ills . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 277

                                                            viii
   4   5   6   7   8   9   10   11   12   13   14