Page 308 - Pipelines and Risers
P. 308

Risk Analysis applied to Subsea Pipeline Engineering                  28 1




























                          1            10          1W
                                        Number (N)ollahlltle8


        Figure 16.2 Societal Risk Acceptance Criteria.

        16.2.4  Environmental Risk
        AI1 incidents considered as initiating in the assessment of individual and societal risks during
        the  operational  phase  are considered to  be  initiating for the  purposes of  determining the
        Environmental Risks.


        Loss  of  containment  incidents  during  operation  of  pipeline  will  have  minor  local
        environmental effects.


        The environmental consequences of  loss of  containment incidents are therefore classified as
        being Category 1 (Table 16.1), i.e. the recovery period will be less than 1 year.

        In addition any incidents having the potential to result in the release of  corrosion inhibitors
        during  commissioning  of  the  pipeline  are  considered  to  be  initiating  with  respect  to
        Environmental Risks.


        Acceptance of  the  environmental risks  associated  with  the  construction and  operation  is
        normally  based  on  the  operator’s criteria which  is  established based  on  economical  and
        political considerations.
   303   304   305   306   307   308   309   310   311   312   313