Page 89 - Plant design and economics for chemical engineers
P. 89

29. FICA-l fails  Deadhead pump  Damage to pump None  See Event 26.
 closing FV-1
 30. V-3 open  Reagent released  FICA-1  Estimate  release
                                quantity.
 More  31. FV-1 fails open  Upset in reactor  Reagent released FICA-1  Possible problem
                                in reactor.
 32. FICA-l fails,  Upset in reactor  Reagent released None  See Event 31.
 opening FV-1
 Pressure
 More  33. V-4 closed  Deadhead pump  Damage to pump PI-l,  See Event 26.
                      FICA-l
 34. FV-1 fails closed  Deadhead pump  Damage to pump PI-l,  See Event 26.
                      FICA-l
 35. FICA-1 fails,  Deadhead pump  Damage to pump PI-1  See Event 26.
 closing FV-1
 36. V-2 and  Deadhead pump  Overpressure  in  PI-l,  Evaluate need for
 V-4 closed  pump or line  FICA-l  hydraulic  relief.
 Less  37. V-2 closed  Pump  cavitates  Damage to pump PI-l,  See Event 1.
                      FICA-1
 38. V-3 open  Reagent released  PI-1  See Event 3.
 Temperature
 More  39. V-4 closed  Deadhead pump  Damage to pump None  See Event 26.
 40. FV-1 fails closed  Deadhead pump  Damage to pump None  See Event 26.
 41. FICA-l fails,  Deadhead pump  Damage to pump None  See Event 26.
 closing FV-1
   84   85   86   87   88   89   90   91   92   93   94