             of the controlled system to deal with disturbances or noise N of dif-
             ferent frequencies.
                The pure dead-time process and the first-order with dead-time or
             FOWDT process were introduced and the frequency domain analysis
             was applied. Because of the dead time, both processes could become
             unstable if the controller parameters were aggressive. Experience has
             shown that the FOWDT  model is  often a  good approximation to
             industrial processes. It has the overall qualitative response of most
             processes and it is a good test for control algorithms because it can
             become unstable in a closed-loop configuration.
                In the next chapter more processes and a new mathematical tool,
             matrices, will be introduced.