Page 62 - Practical Design Ships and Floating Structures
P. 62

Practical Design of Ships and Other Floating Structures                 37
        You-Sheng Wu, Wei-Cheng Cui and Guo-Jun Zhou (Eds)
        Q 200 I  Elsevier Science Lld.  All rights reserved






         THE EXPERIMENT OF RIVER-SEA-GOING ORE BARGE FLEET
             AND RENOVATION OF EXISTING INTEGRATED BARGE

                    Shun-Huai Chen ' , Wei Zhang  , Jun-Ming Li ' and Cheng-Fang Wang '


                                  1  Wuhan University of Technology,
                                       Wuhan, Hubei, China
                                  China Changiiang Shipping -up
                                       Wuhan, Hubei, China



        ABSTRACT
        Wuhan Steel Company (Group) is one of the biggest steel factories in china. Large amounts of raw
        material-iron ore used  in this factory are imported from oversea. How to reduce the high producing
        cost is a key problem. A new kind of shipping system composed of river-sea-going ore barge fleet has
        been put forward to solving the problems such as high producing cost, environment pollution, etc. The
        key technology of the system is to develop a new kind of barge which can be used to form a large
        inland water pusher barge fleet and is suitable for navigating at sea. A typical pusher barge fleet at sea
        is selected to test on full scale by which the reforming has been taken to the barge. Then a model test
        has been carried out to check the reforming effects. In this paper, the conditions and results of tests are
        described. Some useful conclusions are given so that they can be applied in renovation of existing
        integrated barge.


        KEYWORDS

        Shipping system, River-sea-going ore barge, Full scale test, Model test, Renovation of existing
        integrated barge, Pusher-barge-line, Integrated fleet


        1  INTRODUCTION
        Wuhan  Steel Company (Group) is one of the biggest steel factories in china. Large amounts of raw
        material-iron ore used in this factory are imported from oversea. The present shipping route includes
        three steps. The first step is from oversea mining place to the coastal harbor of China - BEILUN by
        150000-300000DWT cargo ships. And then 20000-30000DWT cargo ships are used to transport iron
        ore from BEILUN to inland port like SHANGHAI port, NANTONG port, ZHENJIANG port. At last,
        the iron ore are transported from idand port to the destination by  integrated barge fleet. It  is not
        difficult to see from above that the steel producing cost is very high. It is a major problem that how to
        reduce the producing cost for WSC. For shipping unit, giving the best service to the users is certainly
   57   58   59   60   61   62   63   64   65   66   67