            20.3.1 SECONDARY INJECTION TEST
            In this test we will inject voltage and current (fixed current) as per the manu-
            facturer’s test.
               Recommendation 1 or 2 A. For the Current Transformer (CT) with rated
            current of 1 A we decrease the voltage until we reach the zone reach for
            pH-E and pH pH characteristic for each phase R, Y, B and R-Y, Y-B, B-R
            phases as shown below:
            1. Relay data
               CT 5 2000/1 500 kV Transmission Line (TL)
               Phase-E characteristic Mho relay, pH pH characteristic, quadrilateral
            characteristic.
               Z 1 , Z 2 , Z 3 are given by relay setting engineer for pH-E and pH pH
            where:
               K 0 5 residual earth compensation factor.
                                             ðZ 0 2 Z L Þ
                                   K 0 5 0:6 5
                                               3Z L
               Z 1 5 positive-sequence impedance of TL
               Z 0 5 zero-sequence impedance of TL
                                           500; 000 100
                                 VT ratio 5       =
                                             O3    O3


                                       CT ratio     2000
                               Z s 5 Z p        5 Z p
                                       VT ratio     5000
               (Z s 5 Z p 0.4) and Z 3 reverse 5 0.25Z 1 5 5.25+ 260 degrees
               Z 1 5 21 Ω+80 degrees t 1 5 0
               Z 2 5 26 Ω+80 degrees t 2 5 500 ms
               Z 3 5 33 Ω +80 degrees t 3 5 1000 ms
               Z power swing 5 Z ps 5 1.3Z 3 5 42.9 +80 degrees blocking action after
            t 5 5 seconds.
               Fig 20.3.1 Relay characteristic for pH-E and pH pH.
            2. Pretest procedures:
               1. The current circuit of the CT secondary should be short-circuited if
                  the relay is to be tested in load condition.