Page 217 - Separation process engineering
P. 217
spreadsheet may take less time. However, for multiple uses the programmed spreadsheet is obviously
preferable. In all cases if the CMO assumption is not valid, the results will be incorrect. Note that this
program, and all other software packages, must be checked to make sure it is producing correct results
(Shacham et al., 2008).

