Page 217 - Separation process engineering
P. 217

spreadsheet may take less time. However, for multiple uses the programmed spreadsheet is obviously
                    preferable. In all cases if the CMO assumption is not valid, the results will be incorrect. Note that this
                    program, and all other software packages, must be checked to make sure it is producing correct results
                    (Shacham et al., 2008).
   212   213   214   215   216   217   218   219   220   221   222