Page 111 - Shale Shakers Drilling Fluid Systems
P. 111

94   SHALE SHAKERS AND DRILLING FLUID SYSTEMS































































                                                       FIGURE 2-4

        E); or have a divided deck which uses more than       shaker. The capacity is determined by the combi-
        one screen to cover the screening surface (Figures    nation of two factors:
        2-4B and F); or with individual screens mounted          1. The fluid limit is the maximum fluid flow
        at different slopes (Figures 2-4G and H). On mul-
        tiple deck units, fluid passes through the upper           rate that can be processed through the shaker
                                                                   screen.
        deck before flowing to the next deck (Figures 2-         2. The solids limit is the maximum amount of
        4B, F, and H).
                                                                   solids that can be conveyed off the end of
                                                                   the shaker.
                  SHALE SHAKER LIMITS                         These two limits are interrelated in that the amount
                                                              of fluid that can be processed will decrease as the
          A shale shaker's capacity is reached when ex-       amount of solids increases.
        cessive drilling fluid (or the drilling fluid liquid    Any shale shaker/screen combination has a
        phase) first begins discharging over the end of the   fluids-only capacity (i.e., no solids are present that
   106   107   108   109   110   111   112   113   114   115   116