16    DEFINITION OF SOLID WASTE ANALYSIS AND MINIMIZATION





                   TABLE 1.2     ROUTING SHEET DATA REQUIREMENT

                   DATA                                          PRODUCTION EXAMPLE

                   Component name and number                     Plunger housing

                   Operation description and number              Shape, drill, and cut off
                   Equipment description                         Automatic screw machining

                   Unit times                                    Setup time: 5 h operation time and
                                                                 0.005 h per component
                   Raw material requirement                      1 in diameter × 12 ft of aluminum bar per
                                                                 80 components



                        Body
                  2200
                        Plunger
                        housing
                  3254


                        Spring
                  3253


                        Plunger
                  3252


                        O-ring
                  3251               SA-1               A-1


                        Seat ring
                  3250


                        O-ring
                  3255
                        Plunger
                        retainer
                  4150


                        Lock nut
                  4250                                  A-2


                        Pipe plug
                  1050                                  A-3



                                                        I-1


                        Packaging materials
                                                        A-4

                   Figure 1.4     Assembly chart.
   33   34   35   36   37   38   39   40   41   42   43