Page 303 - Sustainability in the Process Industry Integration and Optimization
P. 303

280   C h apter  Ele v e n


                     minimize the cleaning cost. This change in criterion has only a minor
                     effect on the solution procedure, so an effective solver for the original
                     problem is also useful for the reformulated problem.
                        Twenty-three equipment units, E1 through E23, are available to
                     generate six products, A through F. The changeover time is 70 minutes
                     for equipment units E6, E7, E8, and E9 but 100 minutes for equipment
                     units E1 through E5 and E10 through E20. All other changeover times
                     are presumed to be zero. The number of batches to be produced is
                     given in Table 11.10.
                        Cleaning the equipment units is a costly operation that involves
                     many pollutants. The minimal makespan schedule contains 11
                     cleaning operations, which are denoted by the dotted changeover
                     arcs on its S-graph; see Figure 11.18.
                        The cleaning cost of the solution with minimal makespan is
                     $14,000. In contrast, the solution based on minimizing the cost
                     involves four (rather than 11) cleaning operations and only $3,500 in
                     cleaning cost; its makespan is 6,910 minutes. If the cleaning cost is
                     limited to reach $5,500, then the corresponding makespan is reduced
                     to 6,700 minutes.

                           Product              A   B    C    D    E    F
                           Number of batches    3   5    1    3    9    3


                          TABLE 11.10  Number of Batches Produced of Each Product


                         60         120   540          40    120   60   720
                       E1   E6  310  E11  E22  97    E4   E6    E10   E21  109
                                               A         0                   E
                         0     0       0                                 0
                                         0
                         60    310  120   540          40    120   90    720
                       E1   E6    E11  E22   98  A   E4   E6    E12   E21  110  E
                         0     0       0           70   0    0       0   0
                                          0
                         60    310  120   540          40    120   60    720
                       E1   E6    E11  E22   99  A   E4   E6    E10   E21  111  E
                               0     70    0            0            0   0
                       E1  60  E7  240  E15  120  E22  540  100  B  E4  40  E6  300  E12  90  E21  720  112  E
                         0     0           0            0    0       0   0
                                                 70
                         60         120    540         40    300   60    720
                       E1   E7  240  E19  E22  101  B  E4  E6   E10   E21  113  E
                         0     0      100  0            0    0       0   0
                         60    240  120  E22 540       40    300   90    720
                       E1   E7    E11        102  B  E4   E6    E12   E21  114  E
                         0     0                        0    0           0
                                          0                          0
                         60    240   60   540          40    300   60    720
                       E1   E7    E13  E22   103  B  E4   E6    E10   E21  115  E
                         0     0      100  0            0    0       0   0
                       E1  60  E7  240  E15  120  E22  540  104  B  E4  40  E6  300  E12  90  E21  720  116  E
                                70         0            0    0           0
                                                  100
                         60  E8 120  50   540          40    300   90    720
                       E2         E16  E22   105     E4   E6    E16   E21  117
                                           0   C  100                        E
                         60    240   90   540          40    240   120  720
                       E3   E7    E18  E22   106  D  E5   E7    E19   E23  118
                         0     0           0            0    0           0   F
                         60    240   90   540          40    240   60   720
                       E3   E7    E14  E22   107     E5   E7    E20   E23  119
                                               D         0                   F
                         0     0                   100       0           0
                                                    0
                         60    240   60   720          40    240   120  720
                       E3   E7    E20  E23   108     E5   E7    E15   E23  120
                                               D                             F
                                           70          100
                     FIGURE 11.18  Schedule graph of the solution that minimizes makespan (after
                     Adonyi et al., 2008).
   298   299   300   301   302   303   304   305   306   307   308