Page 32 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 32
Intr oduction 15
main tools are the project checklist and the templates (2.2) or LEED-Online (2009). The
project checklist is used to keep track of overall project success with respect to green
construction, and the templates or LEED-Online are used to keep track of individual
prerequisites and credits during the project and to submit information to the GBCI
during the certification application process.
At the onset of a project after registration, the GBCI supplies the LEED-NC
Registered Project Checklist to the project team. Table 1.2.3 shows a blank LEED-NC 2.2
checklist as downloaded from the USGBC website in May 2007. Table 1.2.4 is an example
of how a project team might format a checklist for LEED-NC 2009.
LEED for New Construction v2.2 Registered Project Checklist (p.1)
Project Name and Address:
Yes ? No
Sustainable Sites 14 Points
Y Prereq 1 Construction Activity Pollution Prevention Required
Credit 1 Site Selection 1
Credit 2 Development Density & Community Connectivity 1
Credit 3 Brownfield Redevelopment 1
Credit 4.1 Alternative Transportation, Public Transportation Access 1
Credit 4.2 AlternativeTransportation, Bicycle Storage & Changing Rooms 1
Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles 1
Credit 4.4 Alternative Transportation, Parking Capacity 1
Credit 5.1 Site Development, Protect of Restore Habitat 1
Credit 5.2 Site Development, Maximize Open Space 1
Credit 6.1 Stormwater Design, Quantity Control 1
Credit 6.2 Stormwater Design, Quality Control 1
Credit 7.1 Heat Island Effect, Non-Roof 1
Credit 7.2 Heat Island Effect, Roof 1
Credit 8 Light Pollution Reduction 1
Water Efficiency 5 Points
Credit 1.1 Water Efficient Landscaping, Reduce by 50% 1
Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 1
Credit 2 Innovative Wastewater Technologies 1
Credit 3.1 Water Use Reduction, 20% Reduction 1
Credit 3.2 Water Use Reduction, 30% Reduction 1
Energy & Atmosphere 17 Points
Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required
Y Prereq 2 Minimum Energy Performance Required
Y Prereq 3 Fundamental Refrigerant Management Required
Credit 1 Optimize Energy Performance 1 to 10
10.5% New Buildings or 3.5% Existing Building Renovations 1
14% New Buildings or 7% Existing Building Renovations 2
17.5% New Buildings or 10.5% Existing Building Renovations 3
21% New Buildings or 14% Existing Building Renovations 4
24.5% New Buildings or 17.5% Existing Building Renovations 5
28% New Buildings or 21% Existing Building Renovations 6
31.5% New Buildings or 24.5% Existing Building Renovations 7
35% New Buildings or 28% Existing Building Renovations 8
38.5% New Buildings or 31.5% Existing Building Renovations 9
42% New Buildings or 35% Existing Building Renovations 10
Credit 2 On-Site Renewable Energy 1 to 3
2.5% Renewable Energy 1
7.5% Renewable Energy 2
12.5% Renewable Energy 3
Credit 3 Enhanced Commissioning 1
Credit 4 Enhanced Refrigerant Management 1
Credit 5 Measurement & Verification 1
Credit 6 Green Power 1
TABLE 1.2.3 Blank LEED-NC 2.2 Project Checklist (Sheet 1)