Page 36 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 36

Intr oduction    19


                                                                    Possible  Tentative
         Yes   ?  No                                                Points   Points
                      IEQc7.1: Thermal Comfort—Design               1
                      IEQc7.2: Thermal Comfort Verification         1
                      IEQc8.1: Daylight and Views Daylight          1
                      IEQc8.2: Daylight and Views—Views             1
                      IDc1: Innovation in Design                    1
                        First ID or EP Item________________________
                      IDc1: Innovation in Design                    1
                        Second ID or EP Item______________________
                      IDc1: Innovation in Design                    1
                        Third ID or EP Item________________________
                      IDc1: Innovation in Design                    1
                        Fourth ID or EP Item_______________________

                      IDc1: Innovation in Design                    1
                        Fifth ID or EP Item_________________________

                      IDc2: LEED Accredited Professional            1
                      RP: Regional Priority                         1
                        First RP: Credit (level)__________SSc4.1__________ ∗
                      RP: Regional Priority                         1
                        Second RP: Credit (level)_______SSc6.1__________ ∗
                      RP: Regional Priority                         1
                        Third RP: Credit (level)_________WEc3 (40%)______ ∗
                      RP: Regional Priority                         1
                        Fourth RP: Credit (level)_______EAc1 (28%/24%)___ ∗
                      RP: Regional Priority                         1
                        Fifth RP: Credit (level)__________EAc2 (1%)________ ∗
                      RP: Regional Priority                         1
                        Sixth RP: Credit (level)_________IEQc7.1__________ ∗
                                                                    Total ∗


        ∗ May only count four of the RP points.

        TABLE 1.2.4  Blank Example LEED 2009 Checklist for Columbia, SC 29201 (Sheet 3) (Continued)
   31   32   33   34   35   36   37   38   39   40   41