Page 33 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 33

16    Cha pte r  O n e



              LEED for New Construction v2.2 Registered Project Checklist (p.2)
                          Materials & Resources                                13 Points
               Y       Prereq 1  Storage & Collection of Recyclables            Required
                       Credit 1.1  Building Reuse, Maintain 75% of Existing Walls, Floors & Roof  1
                       Credit 1.2  Building Reuse, Maintain 100% of Existing Walls, Floors & Roof  1
                       Credit 1.3  Building Reuse, Maintain 50% of Interior Nonstructural Elements  1
                       Credit 2.1  Construction Waste Management, Divert 50% from Disposal  1
                       Credit 2.2  Construction Waste Management, Divert 75% from Disposal  1
                       Credit 3.1  Materials Reuse, 5%                              1
                       Credit 3.2  Materials Reuse, 10%                             1
                       Credit 4.1  Recycled Content, 10% (Postconsumer +  1 ⁄ 2 Preconsumer)  1
                       Credit 4.2  Recycled Content, 20% (Postconsumer +  1 ⁄ 2 Preconsumer)  1
                       Credit 5.1  Regional Materials, 10% Extracted, Processed & Manufactured Regionally  1
                       Credit 5.2  Regional Materials, 20% Extracted, Processed & Manufactured Regionally  1
                       Credit 6  Rapidly Renewable Materials                        1
                       Credit 7  Certified Wood                                     1
                          Indoor Environmental Quality                          15 Points
               Y       Prereq 1  Minimum IAQ Performance                        Required
               Y       Prereq 2  Environmental Tobacco Smoke (ETS) Control      Required
                       Credit 1  Outdoor Air Delivery Monitoring                    1
                       Credit 2  Increased Ventilation                              1
                       Credit 3.1  Construction IAQ Management Plan, During Construction  1
                       Credit 3.2  Construction IAQ Management Plan, Before Occupancy  1
                       Credit 4.1  Low-Emitting Materials, Adhesives & Sealants     1
                       Credit 4.2  Low-Emitting Materials, Paints & Coatings        1
                       Credit 4.3  Low-Emitting Materials, Carpet Systems           1
                       Credit 4.4  Low-Emitting Materials, Composite Wood & Agrifiber Products  1
                       Credit 5  Indoor Chemical & Pollutant Source Control         1
                       Credit 6.1  Controllability of Systems, Lighting             1
                       Credit 6.2  Controllability of Systems, Thermal Comfort      1
                       Credit 7.1  Thermal Comfort, Design                          1
                       Credit 7.2  Thermal Comfort, Verification                    1
                       Credit 8.1  Daylight & Views, Daylight 75% of Spaces         1
                       Credit 8.2  Daylight & Views, Views for 90% of Spaces         1
                          Innovation & Design Process                           5 Points
                       Credit 1.1  Innovation in Design: Provide Specific Title     1
                       Credit 1.2  Innovation in Design: Provide Specific Title     1
                       Credit 1.3  Innovation in Design: Provide Specific Title     1
                       Credit 1.4  Innovation in Design: Provide Specific Title     1
                                     ®
                       Credit 2  LEED  Accredited Professional                      1
                          Project Totals (pre-certification estimates)         69 Points
                          Certified: 26–32 points, Silver:  33–38 points, Gold:  39–51 points, Platinum: 52–69 points

              TABLE 1.2.3  Blank LEED-NC 2.2 Project Checklist (Sheet 2)


                 Templates, or letter templates as they were frequently referred to in LEED-NC 2.1,
             were provided for use by the project team after project registration as is the full LEED-
             Online tool for LEED 2009. They provide an interactive format for many of the
             calculations needed for credit verification. They are used for summary calculations and
             as a tool to track the necessary documentation for submittals for each prerequisite and
             credit applied for. Figure 1.2.3 is a summary figure of the format from LEED 2.2 for part
             of a submittal for a prerequisite that requires drawing submittals and narratives
             explaining the project adherence to the requirements. It is based on the example template
             available for download from the USGBC website for the Sustainable Sites prerequisite
             one (SSp1) for Construction Activity Pollution Prevention. Note that it refers to “credit”
             requirements, even though it is a prerequisite and does not earn points. Figure 1.2.4 is a
   28   29   30   31   32   33   34   35   36   37   38