Page 37 - The Engineering Guide to LEED-New Construction Sustainable Construction for Engineers
P. 37

20    Cha pte r  O n e



               LEED-NC 2.2 Submittal Template
               SS Prerequisite 1: Construction Activity Pollution Prevention
               (Responsible Individual)  (Company Name)
               I, ____________________ , from____________________________
               Verify that the information provided below is accurate to the best of my knowledge.
               ___________________________________________________________________________
               CREDIT COMPLIANCE
               Please select the appropriate compliance path
               Option 1: The Erosion and Sedimentation Control Plan (ESC) conforms to the 2003 EPA Construction General Permit,
               which out lines the provisions necessary to comply with Phase I and Phase II of the National Pollutant Discharge Elimination
               System (NPDES) program.     _________
               OR
               Option 2:  The ESC Plan follows local erosion and sedimentation control standards and codes, which are more stringent than
               the NPDES program requirements.  __________
               SUPPORTING DOCUMENTATION
               The noted project drawing(s) have been uploaded. The drawing(s) shows the erosion and sedimentation control measures
               implemented on the site.
               Sheet Description Log
               Please include sheet name, sheet number and file name for each uploaded, refereneced drawing (e.g. A-101, Site Plan,
               siteplan.pdf)
               ____________________________________________________________________________________________________
               ____________________________________________________________________________________________________
               ____________________________________________________________________________________________________
               ______________________________________________________
               _____ I have provided the appropriate supporting documentation in the document upload section of LEED Online.
               Please refer to the above sheets.
               NARRATIVE (Required)
               Provide a narrative to describe the Erosion and Sedimentation control measures implemented on the project. If local
               standard has been followed, please provide specific information to demonstrate that the local standard is equal to or
               more stringent than the referenced NPDES program.
               ____________________________________________________________________________________________________
               ____________________________________________________________________________________________________
               __________________________________________________________________
               NARRATIVE (Optional)
               Please provide any additional comments or notes regarding special circumstances or considerations regarding the
               project’s credit approach.
               ____________________________________________________________________________________________________
               ____________________________________________________________________________________________________
               _____________________________________________________________________ The project is seeking point(s) for this
               credit using an alternate compliance approach.The compliance approach including references to any applicable Credit
               Interpretation Rulings is fully documented in the narrative above.
               Project Name:




             FIGURE 1.2.3  Portion of example template from the USGBC website for a LEED 2.2
             prerequisite which requires drawings and narrative for submittal (SSp1).



             summary figure of the format for the first portion of Option  1 for the Energy and
             Atmosphere credit number 1 (EAc1), Optimize Energy Performance from LEED 2.2. It
             is depicted to show a template where actual numbers and data are input to the GBCI.
             The actual online process is interactive and will provide appropriate calculations from
             some of the data input.